Operation, cont’d
MAV 44 / 48 / 84 / 88 Matrix Switchers • Operation
3-30
Worksheet example 3: Test configuration
The A/V system in our fictional organization needs to be fine tuned on a regular
basis. Figure 3-46 shows a typical test configuration, with an Extron video test
generator (input 8) generating a test pattern to all monitors (outputs 1, 2, 3, 4, and
8). Sound checks are run from the CD player (input 5) to all audio systems (outputs
1, 2, 4, 5, and 8).
Worksheet Example
Main
Hall
PJ#1
Main
Hall
PJ#2
Podium
monitor
VCR
(USP 405)
Lobby
monitor
Conf.
room
Sound
system
#2
Camera
main
podium
Podium
Mic
VTG 300
Classroom
#2 VCR
(DVS 406)
Audio
CD
Camera
#2
1
2
3
4
5
6
7
8
Input sources
Output destinations
1
2
3
4
5
6
7
8
Laptop
USP 405
Figure 3-46 — Worksheet example 3: Test configuration
Содержание MAV 44 Series
Страница 1: ...MAV 44 48 84 88 Series Matrix Switchers 68 777 01 Rev D 10 07...
Страница 4: ......
Страница 11: ...MAV 44 48 84 88 Matrix Switchers 1 Chapter One Introduction About the Switchers Features...
Страница 16: ...Introduction cont d MAV 44 48 84 88 Matrix Switchers Introduction 1 6...
Страница 17: ...MAV 44 48 84 88 Matrix Switchers 2 Chapter Two Installation Mounting the Switcher Cabling and Rear Panel Views...
Страница 56: ...Operation cont d MAV 44 48 84 88 Matrix Switchers Operation 3 32...
Страница 79: ...MAV 44 48 84 88 Matrix Switchers A Appendix A Specifications and Part Numbers Specifications Part Numbers...