Installation and Operation, cont’d
TLP 350CV • Installation and Operation
2-8
Install Pass-through AAP Cables
Pass-through AAP's must have the cable installed as they are being mounted on
the shelf brackets. Two cutouts in each cable pass-through AAP loosely guide
the cables through the Cable Cubby. Each channel is padded with a grommet to
prevent wear.
A typical installation consists of a VGA
cable, an audio cable, and a network
cable. In this installation, the larger VGA
cable runs by itself in one channel. The
smaller network and audio cables can
run individually in separate channels or
be combined allowing two cables to run
in the channel. Generally it is best to run
one cable per channel.
Match the diameter of the cables to the
channel opening. The combined cable
diameters should still allow the cables to
be freely pulled from the Cable Cubby
and easily returned.
Figure 2-5 — Cable pass-through AAPs
Install cables in the channels as follows:
1.
Place a pass-through AAP onto the shelf bracket with the opening of the
channel accessible. Loosely fasten the AAP with two supplied 4-40 captive
washer nuts as shown in figure 2-6.
2. Press cable(s)
into grommet(s)
1. Mount first
pass-through AAP
Figure 2-6 — Pass-through cable installation
2.
Press the cable(s) into the desired opening(s).
Содержание 60-1017-0200
Страница 1: ...TLP 350CV Cable Cubby TouchLink Panel Control Systems 68 1692 01 Rev A 12 09 ...
Страница 4: ......
Страница 7: ...TLP 350CV 1 Chapter One Introduction About This Manual About the TLP 350CV Features Requirements ...
Страница 53: ...TLP 350CV B Appendix B Reset Modes and Button Replacement Reset Modes Button Kit Contents Button Replacement ...
Страница 58: ...Reset Modes and Button Replacement cont d TLP 350CV Reset Modes and Button Replacement B 6 ...