
Extreme Engineering Operations Manual |
Surface Equipment
Page | 66
Private. Copyright ©
Extre
me Engineering 2012. Unpublished Work. All rights reserved
.
32. You will have to go to the EDR computer and observe the Screen.
In the case below the Azimuth = -999.25 is being received by the EDR.
Figure 87 Azimuth Value received by EDR
This confirms that the EDR is receiving the values.
Now you need to confirm that you are receiving the data back from the EDR.