background image

2

SETUP INSTRUCTIONS 

Please read instructions completely before setting up your marquee. Make sure you have all the components identified on the Parts List. 
Recommended procedure below. For safety reasons it is recommended that 2 persons set-up / pack down any marquee.

4. Attach all corners of the PVC roof to the corner 

connectors on the frame.

5. Insert two of the legs into the corner connectors.

6. Position center pole in the peak of the roof, slide the centre 

pole into cross wires and position.

3. Layout PVC roof over the frame.

1. Layout all roof beams and connectors into position and 

connect.

2. Attach both cross wires from corner to corner and 

then tension.

Содержание PAVILION

Страница 1: ... of weather damage prevention is not guaranteed All marquees are considered temporary structures and MUST be packed down and stowed away during adverse weather conditions such as heavy rain strong winds or other storm events Prolonged exposure to the sun can seriously degrade the material and or cause it to become discoloured WARNING KEEP ALL FLAME AND HEAT SOURCES AWAY FROM THE TENT FABRIC This t...

Страница 2: ... pins PARTS LIST Standard package items listed below Please note accessories are not listed here Aluminium Legs x4 Aluminium Center Pole x1 Aluminium Roof Beams x8 Aluminium Roof Joiner x4 PVC Sandbags x4 Steel Corner Connector x4 Steel Feet x4 Steel Cross Wires x2 500mm Steel Pins x8 Ratchets x4 PVC Roof Protective Cover x1 ...

Страница 3: ...2 persons set up pack down any marquee 4 Attach all corners of the PVC roof to the corner connectors on the frame 5 Insert two of the legs into the corner connectors 6 Position center pole in the peak of the roof slide the centre pole into cross wires and position 3 Layout PVC roof over the frame 1 Layout all roof beams and connectors into position and connect 2 Attach both cross wires from corner...

Страница 4: ...opes together 12 Using the steel pins secure through the foot plates On hard surfaces use sandbags or steel weight plate with concrete blocks 9 Attach steel foot to the bottom of Legs 10 Tie down straps must ONLY be attached from the 2 roof D rings to the lug on the footplate Tension until tight SECURE THE MARQUEE ...

Страница 5: ...rom the centre pole to the ground of 2150mm is achieved If the roof is NOT tensioned correctly it will pool with water when raining and cause the frame to sustain damage or possibly collapse Should concrete weights be used to anchor the marquee 4 additional straps purchased separately should be used Put one end on the lug located on the roof connector and the other end onto the concrete weight che...

Страница 6: ...s recommended that 2 persons set up pack down any marquee 1 Remove steel pins or weight plates Release tension on the cross wires 2 Undo corner ropes and ratchet straps 3 Undo roof straps and remove two legs 4 Remove center pole 5 Remove remaining two legs and fold up roof Ensure roof is completely dry before packing away 6 Remove cross wires and disassemble the frame and store in protective cover...

Страница 7: ...t not listed Contact us for warranty information PRODUCTION DELIVERY TIME FRAMES Extreme Marquee will endeavour to meet all customer due dates and deadlines However as there are many aspects out of our direct control such as third party freight providers we can never guarantee an arrival date As such Extreme Marquees does not accept liability for any missed due dates nor do we accept any refund re...

Страница 8: ...ssories such as side walls as these can be cleaned separately We recommend that the roof of your marquee be cleaned regularly in proportion to the frequency of use Allow your marquee to completely dry before packing down and fitting the protective cover This will prevent mildew and mould growth SMALL STAINS Simply clean with a general use mild household detergent and a clean cloth REPAIRS SPARE PA...

Отзывы: