16
Megacrem
INSTALLATION
TRANSPORT
Positioning
Packaging
Delivery inspection
i
MIN. 10 cm
MIN. 30 cm
Install the machine on a level, sturdy, and water-resistant
surface approximately 110cm above floor level for ease of
access and usage.
Adjust the feet to ensure that it dispenses coffee evenly to
all cups.
Ensure enough free space is available above (>30cm) and
behind (>10cm) the machine to ensure easy cleaning and
maintenance and adequate ventilation.
Do not install the machine if it is wet or damp. Allow it to
dry completely and ask a service technician to ensure that
none of the electrical components have been affected.
Note
:
Leave an air gap of approximately 30cm above
the machine and 10cm behind it to ensure
adequate ventilation.
The machine is shipped in a custom-designed carton which utilizes model-specific polystyrene
cushions to protect it from damage.
The machine’s carton features standardized handling symbols to explain proper shipping and
storage methods.
The machine must remain in a horizontal position during the transport. Do not store or handle the
machine except on its feet.
During transport protect the carton and machine from impact drops, crushing, shocks, moisture
and exposure to extreme temperature.
Upon receipt and delivery ensure that the machine is in the exact condition described in the
enclosed documentation, and that all accessories are included. Missing items should be reported to
the manufacturer or dealer immediately.
Damage caused during transport should be reported to the shipping agent and the machine’s
distributor immediately.
Packaging materials are potentially dangerous and should be kept away from children.
The carton and all packing materials are recyclable and should be returned to a recycling center for
disposal.