background image

ML501_ET | v18

Page

8

Expo Technologies UK

T: +44 (0) 20 8398 8011

E: [email protected]

Expo Technologies US

T: +1 (440) 247 5314

E:[email protected]

Expo Technologies China

T: +86 532 8906 9858

E: [email protected]

Purge Flow Sensor

The Purge Flow Sensor monitors flow through the Purge Outlet Valve. At correct purge flow rates, above the 
minimum specified for purging, the sensor sends a signal that activates the purge timer. This sensor is factory 
calibrated to operate on falling flow rate at or above the minimum specified purge flow rate.

CLAPS Sensor

This sensor monitors the pressure within the pressurized enclosure and sends a control signal to the CLAPS 
Regulator. The normal running pressure must be determined prior to system start-up so that the CLAPS 
Sensor may be set to the level required to control the CLAPS Regulator.

Electronic Purge Timer

When both the enclosure pressure and the purge flow rate are correct, the Purge Flow Sensor activates the 
timer and the electronic timer starts. The timing period is selected using switches mounted on the timer 
module. 

Note: Setting the timer to 00 minutes will cause infinite purging; the cycle will never complete.

During timing, the percentage of the purge cycle is indicated by four LEDs which flashes sequentially while 
the timer is running.

The Electronic Timer contains an intrinsically safe battery pack that needs regular replacement. See 

Commissioning

 section

Alarm Only Circuit (/AO)

If the pressure in the pressurized enclosure is too low the system will normally cut off electrical power to it. In 
certain circumstances, where local codes of practice allow, the system can be altered to provide a hold-on 
circuit that will maintain the electrical power supply to the pressurized enclosure while also providing a 
pressure failure alarm. The user must respond to the alarm and either restore the pressure to the pressurized 
enclosure or otherwise make the installation safe; for example, cut off the electrical supply. The decision to 
use the Alarm Only facility, and the allowable length of time for non-pressurized operation, is the responsibility 
of the user.

Warning: It is potentially dangerous to energise the pressurized enclosure in an non-pressurized 
condition when it is known that there is potentially explosive gas or dust in the hazardous location.

Power Interlock Switch

This flameproof power switch is activated by the signal from the Purge Complete Valve. This activation can 
be used to turn on the electrical supply to the pressurized enclosure. The cable from the switch is terminated 
in the /PA terminal box.

Alarm / Pressurized Switch

This flameproof switch is operated by the pressurized signal. It allows a remote electrical system status 
indicator to show either pressurized or a pressure failure alarm. The cable from the switch is terminated in the 
/PA terminal box.

LED 1

LED 2

LED 3

LED 4

LED 1

LED 2

LED 3

LED 4

LED 1

LED 2

LED 3

LED 4

LED 1

LED 2

LED 3

LED 4

0 to 25%

of purge time

26 to 50%

of purge time

51 to 75%

of purge time

76 to 100%

of purge time

Содержание MiniPurge D808/ET

Страница 1: ...these instructions Please refer to the standard for principles and definition These instructions apply only to the pressurizing system it is the responsibility of the manufacturer of the pressurized e...

Страница 2: ......

Страница 3: ...on of the System 10 Relief Valve Unit 10 Air Supply Quality 10 Pipe Work 11 Multiple Enclosures 11 Provision and Installation of Alarm Devices 11 Power Supplies and their Isolation 11 Power Interlock...

Страница 4: ...Db Tamb 20 C to 55 C IECEx SIR07 0027X Ex pxb ia IIC T5 Gb Ex pxb ia IIIC T100 C Db Tamb 20 C to 55 C PA Power and Alarm Switches Integral PA Terminal Box OV Purge Outlet Valve is pneumatically opera...

Страница 5: ...female Minimum supply line 50 mm 2 I D Pipe Reference points signals 1 8 NPT female Visual Indicators Alarm Red Pressurized Green System Purging 4 LEDs that flash sequentially to indicate elapsed tim...

Страница 6: ...ermediate and CLAPS sensor calibration point For example Minimum pressure 5 mbarg intermediate pressure 6 5 mbarg CLAPS sensor 9 mbarg Purge Time User selectable in 1 minute intervals up to 99 minutes...

Страница 7: ...in air supply pressure during the purge process Operation of the System Once the system is installed correctly turn on the air supply Refer to Commissioning section The purge system commences the purg...

Страница 8: ...be used in IECEx and ATEX Zone 1 21 and or Zone 2 22 Categories 2 and 3 respectively MiniPurge systems may be used for hazards of any gas group Apparatus associated with the MiniPurge system such as i...

Страница 9: ...he enclosure before pressurization Purging is the process of removal contaminated air and replacement with air or inert gas known to be free from flammable gas The duration of this purge process is no...

Страница 10: ...is is the regulator that controls the leakage compensation air flow into the enclosure after the purging is complete It either increases or decreases the air flow into the enclosure as appropriate to...

Страница 11: ...ioning section Alarm Only Circuit AO If the pressure in the pressurized enclosure is too low the system will normally cut off electrical power to it In certain circumstances where local codes of pract...

Страница 12: ...d enclosure Purge air passes through the Relief Valve Unit the preset pressure differential across the appropriate orifice ensures that the purge flow sensor is activated once the selected purge flow...

Страница 13: ...s might affect the calibration of the device In particular the exterior of the spark arrestor should not be painted or blocked in any way Air Supply Quality The MiniPurge system should be connected to...

Страница 14: ...its associated terminal boxes Provision and Installation of Alarm Devices When the pressure inside the pressurized enclosure is above the minimum the Minimum Pressure Sensor returns a positive pressu...

Страница 15: ...ior to commissioning check that the Ex e terminal box is clean the connections have been made properly the cables laid correctly and all screws in the terminals are secure In all cases the application...

Страница 16: ...CLAPS regulator clockwise till the Low Pressure Alarm Indicator turns green This activates the Purge Flow Regulator Slowly open the Purge Flow Regulator until the Pressure Relief Valve opens This is...

Страница 17: ...ssure Sensor check readings on manometer as system will automatically re purge when it reaches minimum pressure 19 While the system re purges return the CLAPS Regulator to the initial setting 20 If th...

Страница 18: ...table for use in the hazardous location There are no unauthorised modifications The air supply is uncontaminated The interlocks and alarms function correctly Approval labels are legible and undamaged...

Страница 19: ...check the correct setting of the relief valve after adjustment The adjustment is sensitive and it is recommended that a 1 4 turn maximum adjustments are applied between tests Re calibration of the Pr...

Страница 20: ...designed for ease of fault finding and many of the components fitted are plug in or chassis mounted Check components by substitution only after establishing that such action is necessary Before carry...

Страница 21: ...in the supply pipe Static pressure of 5 barg must be maintained during purge Check air supply pressure at the inlet to the control unit Ensure that the supply pipe bore is suitable for the flow rate P...

Страница 22: ...e factory set to the value as stated on the Customer Test and Inspection Sheet S0015 018 Pressure gauge Air Supply Pressure 0 10 barg S0015 135 Miniature gauge Logic Pressure 0 4 barg ETM IS31 001 IS...

Страница 23: ...om downloads or refer to ML497 Component Certificate Number Purge System ATEX Certificate SIRA 01ATEX1295X IECEx Certificate IECEx SIR07 0027X INMETRO T V Certificate T V 12 1462X MIU e Ex e Terminal...

Страница 24: ...t i m i L s e i g o l o n h c e T o p x E n o i t c u d o r p B D 5 6 1 W T Y E R R U S M O D G N I K D E T I N U E L G N A d r 3 N O I T C E J O R P S U T A T S G N I W A R D E T A D N W A R D m m N...

Страница 25: ...U S S E R P W O L E T A I D E M R E T N I 8 N E E R G D E R R O T A C I D N I P I R T M R A L A E R U S S E R P W O L 9 N E E R G D E R R O T A C I D N I M R A L A E R U S S E R P W O L E T A I D E M...

Страница 26: ...7 6 6 5 7 2 6 6 1 8 S E T O N E B T S U M E V L A V F E I L E R E H T N W O H S E D U T I T T A E H T N I D E T N U O M b l 1 5 g k 3 2 X O R P P A S I T H G I E W 0 0 1 8 0 0 2 V R A S I E D O C T R...

Страница 27: ...HG DV FRQILGHQWLDO DQG DUH UHWXUQDEOH XSRQ UHTXHVW 7KH DUH QRW WR EH FRSLHG RU FRPPXQLFDWHG LQ SDUW RU LQ ZKROH ZLWKRXW ZULWWHQ FRQVHQW IURP SR 7HFKQRORJLHV LPLWHG QHLWKHU DUH WKH WR EH XVHG LQ DQ ZD...

Страница 28: ...EET No OF SURREY TW16 5DB UNITED KINGDOM DRAWING No SCALE The contents of this drawing document are Copyright Expo Technologies Limited They are to be treated as confidential and are returnable upon r...

Страница 29: ...ORMALLY PLUGGED FLATNESS TO BE LESS THAN 0 4mm OVER ANY 100mm LENGTH UNSPECIFIED TOLERANCES MATERIAL DR WN APP D CHK D DRAWING STATUS APPROVED MOD No DATE ISSUE 3rd ANGLE PROJECTION DIMENSIONS IN mm D...

Страница 30: ...OWN BLACK ALARM PRESSURIZED MOTOR ENCLOSURE PRESSURE BULKHEAD PURGE OUTLET OPEN SIGNAL 2 PURGE INDICATOR YELLOW PURGING ELECTRONIC TIMER TIMER SWITCH PURGE COMPLETE VALVE OR GATE TIMER VALVE INTERMEDI...

Страница 31: ...UH WKHUHIRUH H FOXGHG IURP WKH RZ 9ROWDJH LUHFWLYH 3UHVVXUH TXLSPHQW LUHFWLYH 8 0LQL3XUJH 6 VWHPV DUH FODVVLILHG DV QRW KLJKHU WKDQ FDWHJRU XQGHU UWLFOH RI WKLV LUHFWLYH DQG LQWHQGHG IRU XVH LQ SRWHQW...

Страница 32: ...This Page Intentionally Left Blank...

Страница 33: ...This Page Intentionally Left Blank...

Страница 34: ...This Page Intentionally Left Blank...

Страница 35: ...This Page Intentionally Left Blank...

Страница 36: ...Technologies UK Expo Technologies Ltd Unit 2 The Summit Hanworth Road Sunbury On Thames TW16 5DB UK T 44 20 8398 8011 F 44 20 8398 8014 E sales expoworldwide com Expo Technologies China Qingdao Expo...

Отзывы: