IMPORTANT PLEASE READ BEFORE ASSEMBLY
Chute Refit
•
Refit main chute using bolts found in hinges. Make sure 10mm washers are
reinstalled each side of hinge and 8mm washer is installed between nut and
10mm washer.
Filter Refit
•
Push filter down firmly so that tube presses on white pre filter disc and tighten
with a screwdriver.
The user manual has all the information about operating the machine and trouble
shooting. Below are the key points to stay safe and avoid jams or creating a mess.
If GLS Machine has lever jack please read instruction on
reverse
of this sheet.
Key Points
•
Never open the machine when it is turned on or plugged in at the wall.
•
Never over fill the GLS bucket or GLC Wheel Bin or use a foreign bucket or
bin.
•
Never put a bottle in before the machine is turned on.
•
After the last bottle has gone through let it run for a few seconds to clear all
particles.
•
Never attempt to put in broken glass or clear a jam without using gloves.
•
If you run the machine on an extension cord keep it as short as possible to.
ensure the machine operates at its most efficient. 10-15m max.
•
Keep the machine indoors.
•
IMPORTANT
always feed bottles into chute with pressure that
fires
bottles
into chute rather than easing them into chute
Please contact us once you have your machine set up and someone will talk you
through all the features and finer points of operation to ensure you get the best out of
your GLS or GLC glass crusher.
I look forward to hearing from you in the near future and wish you all the best in
reducing your glass waste and improving your business sustainability.
Kindest Regards
Tim Barnett
Marketing Manager
Содержание Oppressor GLC
Страница 9: ...T 021324216 ...
Страница 10: ......