![Exmark Ultravac Bagger 126-8680 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/exmark/ultravac-bagger-126-8680/ultravac-bagger-126-8680_setup-instructions_2450969004.webp)
5.
Apply a light coat of Mobil HTS grease (or food
grade antisieze) to the top portion of the spindle
shaft where the sheave mounts.
6.
Install double sheave onto the right spindle shaft.
Install the spring disc washer and nut. Make sure
that the spring disc washer cone is installed towards
nut (see Figure 5). Torque the sheave nut to 140-145
ft-lb (190–197 N-m).
Block the blade rotation with a block of wood
between the blade and baffles as indicated in the
blade service section of the Operator’s manual.
Do Not use the blade bolt to prevent rotation.
g007021
Figure 5
1.
Torque sheave nut to 140-145 ft-lb (190–197 N-m).
2.
Install with cone towards nut.
Check blade bolt torque after completing this
installation.
Torque blade bolt to 50-60 ft-lb (75-81 N-m).
7.
Re-install the deck drive belt in the lower groove of
the double sheave. Install the plug into the bore of
the double sheave.
g242158
Figure 6
1.
Belt cover bracket
4.
Belt
2.
Belt cover
5.
Deck sheave and nyloc
plug
3.
Knob
Installing the Blower Assembly
1.
Pull the spring loaded idler back and slip the belt
over the top deck sheave.
g009311
Figure 7
1.
Impeller sheave
3.
Spring loaded idler
2.
Deck sheave
2.
Position the belt cover at an angle and slide it under
the mower frame (see Figure 8).
4