Setup
g020057
Figure 4
Vantage 36
1.
Flip up discharge
deflector
3.
Operator Controlled
Discharge accessory
assembly
2.
Adapter kit
g020058
Figure 5
Vantage 36
1.
Hairpin
2.
Cable bulkhead jam nuts
3.
Cover (hidden for clarity)
4.
Knob
5.
RH front deck lift bracket clearance hole
3.
Pivot the assembly towards the deck. The front
pin should engage into the slot in the deck or
adapter as shown in Figure 6.
g020069
Figure 6
1.
Latch
3.
Front pin
2.
Operator Controlled
Discharge accessory
assembly
4.
Slot
•
If the front pin does not engage in the slot
in the deck or adapter, loosen or completely
remove the hardware in the gate link frame
as shown in Figure 7. Position the gate link
frame so that the front pin aligns with the slot.
Reinstall hardware, if removed, and tighten.
Pivot the assembly towards the deck and
engage the front pin into the slot.
g020070
Figure 7
1.
Gate link frame
4.
Shim (storage position)
2.
Adjustment slots
5.
Pivot mount assembly
3.
Hardware
6.
Shim (installed position)
•
Due to manufacturing variance, the gate
link frame may not close and have complete
contact all around the discharge opening.
Any gaps are to be minimized. If the rear of
the gate link frame contacts the mower deck
while rotating it towards the deck creating a
gap at the front, use the steps below to install
9
Содержание 116-8430
Страница 22: ...Notes 22...
Страница 23: ...Service Record Date Description of Work Done Service Done By 23...