
8 Installation
Powerware
®
Plus 12 Operator's Manual (164200090 Rev E)
42
Electrical Installation
Only qualified service personnel (such as a licensed electrician) should
perform the electrical installation. Risk of electrical shock.
Refer to your national and local electrical codes for acceptable external wiring
practices. Material and labor for the external wiring are customerĆsupplied. An external
protective device for the input source must be provided and sized for the currents
indicated on the UPS nameplates.
NOTE:
Upstream protection must be coordinated with the load current requirements
under nominal as well as lowĆline and overload conditions. The recommended
input stream service protection is 60 amps.
The UPS must be grounded at the input terminal block to a singleĆpoint local or utility
earth ground. The ground conductor should be sized according to your national and
local electrical codes. In the United States, the output is a separatelyĆderived source.
If you are using remote batteries, a DC breaker suitable for branch circuit protection
is required. The DC breaker is customerĆsupplied and must be rated at 250V, 75A.
The maximum fault current from a remote battery cannot be more than 4500 amps.
See Figure 16 for the location of the power cable terminal block and the conduit
access. Use the following procedure to perform the electrical installation for your UPS:
Power Cable
Terminal Block
Removable
Conduit
Plate
Battery Cabinet
UPS Cabinet
Removable Power Cable
Terminal Block Plate
Figure 16. Terminal Block and Conduit Access
.
Determine your equipment's grounding requirements according to your local
electrical code.
. Remove the screws on the terminal block plate and the conduit plate of the
UPS rear panel with a 1/4
I
hexĆnut driver.
Содержание powerware plus
Страница 1: ... OPERATOR S MANUAL ...
Страница 12: ...Powerware Plus 12 Operation ...
Страница 35: ... Powerware Plus 12 Operator s Manual 164200090 Rev E 35 ...
Страница 52: ...Description Outline Drawing PWP 18 Drawing No 110719045 Revision A Sheet 1 of 1 ...
Страница 53: ...Description Oneline and Installation PWP 18 Drawing No 110719046 Revision A1 Sheet 1 of 2 ...
Страница 54: ...Description Oneline and Installation PWP 18 Drawing No 110719046 Revision A1 Sheet 2 of 2 ...
Страница 55: ...Description Battery Cabinet Installation and Mounting PWP18 Drawing No 110719062 Revision A1 Sheet 1 of 2 ...
Страница 56: ...Description Battery Cabinet Installation and Mounting PWP18 Drawing No 110719062 Revision A1 Sheet 2 of 2 ...
Страница 57: ...Description Three Phase PDM Installation PWP 18 Drawing No 110719090 Revision A1 Sheet 1 of 1 ...
Страница 58: ...Description PWP18 Schematic Drawing No 110712322 Revision A Sheet 1 of 1 ...
Страница 59: ...Description I O Outline and Installation PWP18 Drawing No 110719176 Revision B Sheet 1 of 1 ...
Страница 60: ...Description I O Cabinet Oneline PWP 18 Drawing No 110719175 Revision C1 Sheet 1 of 5 ...
Страница 61: ...Description I O Cabinet Oneline PWP 18 Drawing No 110719175 Revision C1 Sheet 2 of 5 ...
Страница 62: ...Description I O Cabinet Oneline PWP 18 Drawing No 110719175 Revision C1 Sheet 3 of 5 ...
Страница 63: ...Description I O Cabinet Oneline PWP 18 Drawing No 110719175 Revision C1 Sheet 4 of 5 ...
Страница 64: ...Description I O Cabinet Oneline PWP 18 Drawing No 110719175 Revision C1 Sheet 5 of 5 ...