Exhausto RS 12 Скачать руководство пользователя страница 12

12/16

5.  System Start-Up

 

5.1  System testing

 

  

Before any adjustments are made to the system, follow these procedures:

 

•   Turn the chimney fan ON and make sure that it is operating.  Increase and decrease the speed 

 

 

of the fan by adjusting the fan speed control to make sure it is operating properly.

 

•   Turn the fan OFF and make sure the pressure switch opens, so the power to the circuit, it controls, 

 

 

is disconnected.

 

Notice:  Do not blow air into the tube going to the pressure switch as this may damage the 

 

diaphragm.

 

5.2  Adjusting the Chimney Fan Speed

 

  

Start all appliances up.  Use the fan speed control to set the speed of the chimney fan so no back 

 

 

pressure is experienced anywhere in the system.  Check the system for flue gas spillage.  Mark this 

 

 

setting on the fan speed control cover.

 

5.3  Adjusting the pressure switch setting 

 

  

Remove the snap-on cover from the conduit enclosure by loosening its retaining screw.  Turn the 

 

 

slotted Adjustment Screw clockwise to raise the set point pressure and counter clockwise to lower 

 

 

the set point. 

 

 

Set the adjustment to its lowest position.  With all appliances operating, reduce the speed of the fan 

 

 

to the point, where the appliance(s) starts to spill flue gas.  Increase the speed of the fan gradually 

 

 

to the point where there is no more spillage.  Raise the switch’s set point so it just opens.  Return the 

 

 

fan speed to the original setting marked on the cover.

 

 

The system is now adjusted so flue gas spillage will disconnect the heating system.

NorthlineExpress.com

http://www.northlineexpress.com

Toll-Free 1-866-667-8454

Содержание RS 12

Страница 1: ...76 770 587 3238 800 255 2923 Fax 770 587 4731 info exhausto com us exhausto com RS Chimney Fan For Gas Oil Applications CAN Installation Operating Manual USA 3000270 10 01 NorthlineExpress com http ww...

Страница 2: ...8 2 6 Installation for high temperatures 8 3 Installing Safety System 3 1 Installing Dwyer Pressure Switch 9 4 Wiring the Chimney Fan 4 1 General 10 4 2 Wiring diagram for solenoid operated gas valve...

Страница 3: ...having jurisdiction the installation must also conform to the Standard for Draft Equipment All electrical wiring must be in accordance with the requirements of authority having jurisdiction or in abs...

Страница 4: ...1 Hinges 6 Bird Screen Fan Size RS 9 RS 12 RS 14 RS 16 A 10 11 13 16 B 12 14 16 19 C 11 2 5 14 15 4 5 18 D 3 3 3 5 4 4 E 8 1 2 11 1 8 12 3 4 14 3 4 Weight lbs 28 36 46 60 Elec Character 120 1 60 Amps...

Страница 5: ...on otherwise improper operation and inadequate venting of deadly flue gases may result Support system for the chimney fan Prior to installation of the chimney fan it must be assured the chimney can sa...

Страница 6: ...the fiber mat must face upward against fan base Step 2 Preparation of fan Locate the installation brackets in the grooves on the under side of the fan base using the bolts and nuts supplied to secure...

Страница 7: ...de of the fiber mat The aluminum foil on the fiber mat must face upwards against fan base Step 2 Preparation of fan Locate the installation brackets in the grooves on the underside of the fan base usi...

Страница 8: ...nd bolt the base onto the wall with the hinges pointing upwards After mounting the base securely attach the fan motor housing by assembling the fan hinges again Seal with silicone all around the fiber...

Страница 9: ...of the probe is approximately 2 and if necessary it should be cut back so it is flush with the inner wall of the pipe Attach the probe to the outer pipe wall with the two metal screws Step 4 Connect...

Страница 10: ...erential Switch fan proving switch must be wired so they shut down all appliances connected to the chimney Wiring diagrams can be found on the following pages Power requirements for the system depends...

Страница 11: ...rruption of the draft causing the draft to fall below the pressure switch set point will open the pressure switch and deactivate the Solenoid Operated Gas Valve 1 The thermostat closes the relay RE 2...

Страница 12: ...in the system Check the system for flue gas spillage Mark this setting on the fan speed control cover 5 3 Adjusting the pressure switch setting Remove the snap on cover from the conduit enclosure by...

Страница 13: ...s inspected Creosote and other deposits should be removed from the fan blades and the bottom of the motor housing The top of the fan is hinged and can be opened in order to ease the cleaning Warning D...

Страница 14: ...14 16 Notes NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8454...

Страница 15: ...15 16 Notes NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8454...

Страница 16: ...0 Northmeadow Parkway STE 180 Roswell GA 30076 770 587 3238 800 255 2923 Fax 770 587 4731 info exhausto com us exhausto com Inc NorthlineExpress com http www northlineexpress com Toll Free 1 866 667 8...

Отзывы: