Remove one M8x92 Bolt (39), one M8x7.7T Nylon Nut (44), and one
5/16”x20x2.0T Washer (48) from the Right Foot Bar (6). Remove bolt and
nylon nut with the Hex Tool with Phillips Screwdriver and M5 Allen wrench
provided.
Pull the Right Foot Bar (6) up onto the Right Handrail Arm (4) and align bolt
holes. Then attach the Right Foot Bar (6) onto the Right Handrail Arm (4)
with one M8x92 Bolt (39), one M8x7.7T Nylon Nut (44), and one
5/16”x20x2.0T Washer (48) that were removed. Tighten bolt and nylon nut
with the Hex Tool with Phillips Screwdriver and M5 Allen wrench provided.
Install three M8x45 Nut Caps (72) onto one M8x7.7T Nylon Nut (44) and two
M8x16mm Hexagon Head Bolts (47).
Repeat above steps to install the Left Handrail Arm (3) onto the horizontal axle
of the Front Post (2) and Left Rotate Bar (7) onto the Crank (11) axle.
NOTE: PLEASE FULLY TIGHTEN M8x20MM BOLTS (59) WITH THE HEX
TOOL WITH PHILLIPS SCREWDRIVER PROVIDED IN STEP 4.
ASSEMBLY
16
M8x45 Nut Cap (72)
M8x45 Nut Cap (72)
M8x45 Nut Cap (72)
Содержание Pro Stride 21
Страница 4: ...IMPORTANT LABELS 3...
Страница 6: ...PART DRAWING 5...
Страница 18: ...ASSEMBLY 17 INCORRECT CORRECT Hex Tool with Phillips Screwdriver 13mm Tool Allen Wrench M5...