Excelsior DK4EXA075 Скачать руководство пользователя страница 1

 P/N# 240007135, Rev. A [04/08]

An ISO 9001-2000 Certified Company

EXCELSIOR

High Efficiency

Oil Fired Hot Water Boiler

MEMBER: 

The Hydronics Institute

Dunkirk BOiLErS

85 Middle Road
Dunkirk, NY 14048
www.dunkirk.com

Inst

alla

tI

on, opera

tI

on and ma

Inten

ance 

man

U

al

Содержание DK4EXA075

Страница 1: ...n ISO 9001 2000 Certified Company EXCELSIOR High Efficiency Oil Fired Hot Water Boiler MEMBER The Hydronics Institute Dunkirk BOILERS 85 Middle Road Dunkirk NY 14048 www dunkirk com Installation opera...

Страница 2: ...A165 The boiler is a natural draft oil fired hot water boiler comprised of cast iron sections The boiler is avail able with 4 5 6 or 7 cast iron sections These sections are held together by push nippl...

Страница 3: ...s breech gasket flue cover gasket etc or attempt any service or repair work involving RCF or fiberglass without wearing the following protective gear A national Institute for Occupational Safety and H...

Страница 4: ...OILER 9 ASSEMBLING THE BOILER 13 BOILER SYSTEM PIPING 21 PIPING DIAGRAMS 23 FUEL OIL PIPING 35 ELECTRICAL CONNECTIONS 37 CHIMNEY AND CHIMNEY CONNECTIONS 39 OPERATING THE BOILER SYSTEM START UP 43 OIL...

Страница 5: ...actices All wiring on boilers installed in Canada shall be 2 made in accordance with the Canadian Electrical Code C22 2 and or local regulations The following terms are used throughout this manual to...

Страница 6: ...on on combustible flooring Do not install boiler on carpeting Do not tamper with or alter the boiler or controls Inspect flue ways at least once a year Preferably at the start of the heating season Th...

Страница 7: ...the expansion tank s air charge will need to be increased to match the fill pressure Consult the expansion tank manufacturer s guidelines for sizing and selection Purging the heating system of air and...

Страница 8: ...the system piping The Net I B R Ratings shown are based on a piping and pickup factor of 15 in accordance with the I B R Standard as published by the Hydronics Institute The Net I B R Rating of the b...

Страница 9: ...8 17 3 4 7 34 1 4 27 1 2 17 3 4 LOCATING THE BOILER TABLE 2B BOILER CLEARANCES Unit Combustible Clearance Accessibility Clean ing and Servicing Top 12 24 Right Side 2 24 Left Side 2 24 Floor Combusti...

Страница 10: ...10 NOTE ALWAYS KEEP THE MANUAL FUEL SUPPLY VALVE SHUT OFF IF THE BURNER IS SHUT DOWN FOR AN EXTENDED PERIOD OF TIME INSTALLATION REQUIREMENTS Figure 2 General Requirements for a typical installation...

Страница 11: ...uct cross sectional area shall be same as opening free area FRESH AIR FOR COMBUSTION Horizontal Ducts c Minimum free area of 1 square inch per 2 000 BTU per hour input of all equipment in space Duct c...

Страница 12: ...DUCT CAPACITIES Through Louvers Fresh Air Duct Size Mesh Screen Wood Louvers Metal Louvers Btuh Btuh Btuh 3 x 12 144 000 36 000 108 000 8 x 8 256 000 64 000 192 000 8 x 12 384 000 96 000 288 000 8 x 1...

Страница 13: ...nto slotted mounting bracket holes NOTICE Inspect Swing door insulation and rope gasket 5 Inspect fiber rope located on the swing door The A rope must be evenly distributed around the perimeter of the...

Страница 14: ...ion well 14 Install in upper NPT port facing front See Figure 6 Install Aquastat Control Harness Assembly 15 Loosen mounting screw on bottom of case Insert sensor into immersion well Mount control on...

Страница 15: ...ional ASSEMBLING THE BOILER No valves may be installed between boiler and controls manifold or safety relief valve WARNING TABLE 4 CONTROLS MANIFOLD PORT SCHEDULE PORT PORT SIZE DESCRIPTION A 1 4 NPT...

Страница 16: ...evel Manual Reset optional and the harness from the Aquastat through the rear jacket panel See Figure 11 Connect the molex plugs on the end of each wire harness to its respective plug on the control p...

Страница 17: ...E TO WHITE BLACK TO YELLOW GREEN TO GROUND SCREW Figure 10 Circulator wiring Figure 11 SUPPLIED JUMPERS AQUASTAT CONTROL HARNESS 120 VAC POWER BURNER HARNESS Ensure all conduit is secured to prevent c...

Страница 18: ...ng a diagonal sequence E Plug burner power cord into power harness F Attach flexible oil hose included in parts box G Install the Drain Valve 20 Install drain valve with hose connection facing right o...

Страница 19: ...in the tank This compressed air cushion permits the water in the system to expand as the temperature changes and assures a full measure of water even in the highest radiation unit of the system The di...

Страница 20: ...provide the circulation required by the heating system The circulator should be connected to the supply main and must be wired into the boiler s electrical system See the System Piping section for pi...

Страница 21: ...ust be mounted 3 in the 3 4 supply manifold tapping or in the system piping above the boiler The minimum safe water level of a hot water boiler is just above the highest water containing cavity of the...

Страница 22: ...ter zone A inch bypass line must be installed as shown in the piping diagrams for the systems identified above BOILER SYSTEM PIPING A bypass valve cannot protect the boiler from sus tained condensing...

Страница 23: ...R DRAIN VALVE CONTROLS MANIFOLD TO SYSTEM FROM SYSTEM CIRCULATOR PRESSURE REDUCER VALVE CHECK VALVE AIR SEPARATOR HOSE BIB EXPANSION TANK Diagram 1 Standard piping near boiler No valve may be installe...

Страница 24: ...Y ZONE CIRCULATOR EXPANSION TANK FLOW CONTROL VAVLE SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB PIPING DIAGRAMS 24 Diagram 2 Single Zone system with...

Страница 25: ...CE CONSIDER USING ZONE CIRCULATOR SEE FIGURE 5 ZONE 4 CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE EXPANSION TANK AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL VALVE PIPING DIAGRAMS 2...

Страница 26: ...CIRCULATOR CH CIRCULATOR CIRCULATOR FLOW CONTROL VALVE SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB EXPANSION TANK PIPING DIAGRAMS 26 Diagram 4 Multi...

Страница 27: ...DHW CIRCULATOR CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL VALVE EXPANSION TANK PIPING DIAGRAMS 27 Diagram 5 Multizone system...

Страница 28: ...PREVENT FORCED FLOW IN SECONDARY ZONE 4 DHW CIRCULATOR CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL VALVE EXPANSION TANK PIPIN...

Страница 29: ...VALVE FOR OPTIMUM TANK PERFORMANCE CONSIDER USING ZONE CIRCULATOR SEE FIGURE 13 CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL V...

Страница 30: ...OR LOCATION ZONE 4 USE FULL PORT ZONE VALVE DHW CIRCULATOR CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL VALVE EXPANSION TANK P...

Страница 31: ...RNATE CIRCULATOR LOCATION TO SYSTEM FROM SYSTEM CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE 3 WAY MIXING VALVE AIR SEPARATOR HOSE BIB EXPANSION TANK 31 Diagram 9 Bypass pip...

Страница 32: ...ROM SYSTEM V2 V1 CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE EXPANSION TANK 32 Bypass piping fixed low temp only Diagram 10 Adjust the two throttli...

Страница 33: ...ON TO SYSTEM FROM SYSTEM CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR HOSE BIB FLOW CONTROL VALVE 4 WAY MIXING VALVE EXPANSION TANK 33 Diagram 11 Bypass piping...

Страница 34: ...Piping for Combination Heating and Cooling Refrigeration System WATER CHILLER AIR CUSHION TANK CIRCULATOR SHUT OFF VALVES SUPPLY MAIN TO COMBINED HEATING COOLING SYSTEM RETURN MAIN FROM COMBINED HEAT...

Страница 35: ...ances can copper with sweat style connectors be used WARNING Some jurisdictions require the use of a fusible shutoff valve at the tank and or the burner In addition some jurisdictions require the use...

Страница 36: ...mber of Boiler Section Total Volume Gallons 4 3 6 5 4 3 6 5 1 7 5 9 TABLE 7 PIPING WATER VOLUMES PIPE SIZE COPPER PIPE FACTOR STEEL PIPE FACTOR 82 5 63 5 40 0 36 0 1 23 3 22 2 1 15 3 12 8 1 10 8 9 5 2...

Страница 37: ...electrical work Each boiler must be protected with a properly sized fused disconnect Never jump out or make inoperative any safety or operating controls Positively assure all electrical connections ar...

Страница 38: ...38 ELECTRICAL CONNECTIONS 240007363 Figure 18 Wiring Diagram All Models optional equipment shown...

Страница 39: ...d from type L vent or a factory built chimney that complies with the type HT requirements of UL103 See Figure 20 for recom mended installation Chimney Inspection Prior to the installation of any 4 new...

Страница 40: ...chimney may be a sign of condensate dam age to the chimney A chimney professional shall be contacted immediately to examine the damage and recommend a solution Long term operation while in this condi...

Страница 41: ...41 Chimney and chimney connections Figure 20 Typical Chimney Locations Figure 19 Proper draft vent locations...

Страница 42: ...mney connector or stack NFPA 31 and CSA B139 have information to help the 2 installer make an appropriate choice of venting mate rials In some cases a chimney may have to be lined to create sufficient...

Страница 43: ...mpletion open all zone valves Close purge valve continue filling the system until H the pressure gauge reads 12 psi Close shut off valve in cold water supply piping The maximum operating pressure of t...

Страница 44: ...ess any key Control Operating Characteristics The L7248A can be in any three 3 operational states Normal High Limit and Error The controller moves back and forth from High Limit to Normal state as par...

Страница 45: ...e port Locate oil pressure adjusting screw and turn screw II to obtain proper pump pressure refer to Burner Settings section of this manual To check the cut off pressure deadhead a reliable III pressu...

Страница 46: ...his feature limits the number of recycle trials for each call for heat to a maximum of three trials If the flame is lost three times and does not successfully satisfy a call for heat the R7184 locks o...

Страница 47: ...witch timing indicated on label and control enters Restricted Mode Indicator light flashes 1 2 second on 1 2 Second off Ignition and motor stop and oil valves closes To reset from Restricted Mode Pres...

Страница 48: ...e burner s air adjustment to obtain a smoke reading showing a trace smoke reading Once the smoke reading is a trace measure the CO2 and as an in surance margin increase the air to sufficiently reduce...

Страница 49: ...49 This page intentionally left blank...

Страница 50: ...AIR BAND AIR SHUTTER Z OR AIR HEAD SETTING BECKETT AFG 4 L2 3 375 U 2 675 0 75 140 0 65 X 60B 0 7 N A 5 L2 3 375 U 2 675 1 140 0 85 X 60B 2 10 N A 6 V1 2 75 M 2 675 1 30 140 1 10 X 60AS 1 10 0 7 V1 2...

Страница 51: ...burner part numbers BURNER MAKE BOILER MODEL BURNER PART PUMP PRESSURE DELAVAN HAGO DANFOSS Beckett AFG 75 240007232 140 PSIG 0 65 X 60 B 0 65 X 60 B N A 100 240007233 140 PSIG 0 85 X 60 B 0 85 X 60 B...

Страница 52: ...to the valve manufacturer s instructions packaged with the valve for more details CONVENTIONAL EXPANSION TANK As noted in the EQUIPMENT AND ACCESSORIES section DIAPHRAGM EXPANSION TANK As noted in th...

Страница 53: ...system other than the expansion tank must be full of water for satisfactory operation Water should be added to the system until the boiler pressure gauge registers 12 psi To insure that the system is...

Страница 54: ...a manner that will not strip the threads when service is completed WARNING If Boiler is not used during winter time it must be fully drained to prevent freeze damage C FREQUENT WATER ADDITION Althoug...

Страница 55: ...2nd pass G Vacuum the loose debris in the bottom of the com H bustion chamber and smoke box Clean the combustion chamber and baffles 2 Use a wire or fiber bristle brush to clean the surfaces of the c...

Страница 56: ...pe recommended for use on this boiler See label on side of boiler These are general instructions for cleaning an oil burner For specifics consult the burner manufacturer s instructions OIL BURNER CLEA...

Страница 57: ...chills the flame and causes smoke and unburned fuel to pass out of the combustion chamber and clog the flue ways of the boiler Cold Oil If the oil temperature approaching the fuel E pump is 40 F or c...

Страница 58: ...switches installed Look for a red plate which may be on the service switch Controls out of adjustment Reset according to instructions Circulating pump not running Check over current protection Check r...

Страница 59: ...____________________________________________ _________________________________________________________ _________________________________________________________ _______________________________________...

Страница 60: ...te Service Performed Company Name Tech Initials Company Address Phone For technical assistance with this product call toll free 1 800 325 5479 ECR International PO Box 4729 Utica NY 13504 4729 www ecr...

Отзывы: