For stacking, make sure that all four locking pins pass completely through the female
stacking bolt.
•
Make sure the four male bolts enter into the correspondent female bolts and are
locked.
Do not install the FRAME-EVO-P20 / P20-US or the projector while people are present
under the mounting zone during the installation process.
•
When installing the projector, make sure no one is in the area underneath the
installation zone.
Always secure the frame to the rigging truss with rigging slings with steel cable insert and
shackles (two sets of rigging sling and shackle are recommended).
•
The frame must always be secured with an appropriate rigging sling and shackle so
that in case of a malfunc
tion it doesn’t fall more than 10
cm. It is recommended to
use two sets of rigging sling and shackle to avoid too much dynamic forces as well as
the projector swinging. Please consult the local laws or regulations regarding the
additional safety of hanging equipment.
CAUTION
Before installing the projector in the FRAME-EVO-P20 / P20-US frame, please read the
projector’s user manual. When the projector has a
lens attached, please remove it.
•
The FRAME-EVO-P20 / P20-US frame with the projector inside must be installed only
in an environment that is recommended by the projector manufacturer.
Minimum two persons are required to install the FRAME-EVO-P20 / P20-US frame.
•
With regard to the overall weight of all necessary installation devices, make sure to
handle those with at least two people.
Make sure that the structure from which you hang up to 3 FRAME-EVO-P20 / P20-US
frames including projectors is capable of carrying the overall weight of approx. 290 kg
(639.34 lbs) plus the weight of all additional equipment as well as other potential systems.
•
Prior to any installation, you must do a visual inspection to make sure that the system
is in a good condition. For mor
e information please refer to chapter “
maintenance and inspection (Re-examination)