background image

EO

S

JU

N

IO

R

3

A

A

Optional: Insert a bolt into each corner post  channel for where the top shelf and/or Seed Tray  will be located.  See 

shelf/seedtray pages for  

location information.

8

Содержание EOS JUNIOR VICTORIAN

Страница 1: ...60 8500 Note This is an all inclusive manual It shows optional accessories and customizations that may not apply to your greenhouse Direct any questions to Exaco The Junior Victorian assembly is simil...

Страница 2: ...18 20 Accessories please call Exaco or your retailer to order optional items Sliding Door Assembly and Installation 22 24 OPTIONAL Sliding door lock 25 OPTIONAL Sliding door lowered threshold 26 27 R...

Страница 3: ...oring of the foundation should be made by the owner or operator and should be checked periodically During winter the roof will need to be cleared of snow or supported in a suitable way The greenhouse...

Страница 4: ...ts are 1 5 x 1 5 They attach at the interior corners of the base frame The anchor posts then extend 12 into the ground concrete There will be bolts inserted at the bottom of the anchor to catch in the...

Страница 5: ...USTRATION COUNT IN INCHES 3 Sapak_EOS contains black PVC gable ridge covers long bolts nuts for corner anchors small L brackets for gable assembly L2G single sliding door Main hardware for assembling...

Страница 6: ...3 16 14 3 16 14 3 16 14 3 16 14 3 16 Gable End Pieces Gable End Pieces Gable End Pieces 72 3 4 72 3 4 72 3 4 57 1 16 57 1 16 57 1 16 32 1 2 32 1 2 32 1 2 24 5 8 24 5 8 24 5 8 26 3 4 26 3 4 26 3 4 35 1...

Страница 7: ...PRO6120 PRO6578 PRO20779 PRO20229 PRO40091 PRO210 PRO1456 PRO6918 PRO1456 PRO20229 Model shown is a JVIC 25 5...

Страница 8: ...M6x15 bolts as shown for the sliding door guide Suggestion If installed on a concrete foundation you may cut PRO210 flush with the bottom of PRO6120 To anchor use cut off PRO210 pieces as L brackets t...

Страница 9: ...ner post PRO6578 loosen the nuts on the corner anchor to give you a bit of wiggle then tighten all nuts It is also helpful to have a second person hold the threaded ends of the bolt to orient the head...

Страница 10: ...EOS JUNIOR 3 A A Optional Insert a bolt into each corner post channel for where the top shelf and or Seed Tray will be located See shelf seedtray pages for location information 8...

Страница 11: ...EOS JUNIOR 4 A A OPTIONAL If you purchased shade curtains insert the slider loops into the gutter profile channel before this assembly step See shadecloth pages for more information 9...

Страница 12: ...EOS JUNIOR 5 1830 mm item pc L M6x12 PRO20229 768 mm L R LR 3 12 pc pc PRO1456 2 2 130 mm pc REF EJ 13 3 1 4 1 2 3 4 2 10 Height of the door header bar will be 1830mm 72 high...

Страница 13: ...EOS JUNIOR 6 A B A B 11 Optional if you ordered a seedtray shelf you may insert a bolt in these vertical supports...

Страница 14: ...EOS JUNIOR 7 If your wind braces do not reach where they are designed to attach your greenhouse is not level square You may need to make adjustments at this time so they will reach 12...

Страница 15: ...lt into channel on PRO6918 to attach gable verticals shown in B on next page Note If you have a shadecloth it is a good time to insert the shadecloth sliders into your ridge beam channel See shadeclot...

Страница 16: ...EOS JUNIOR 9 C A B A B C A B PAG EJ 11 C 14 Note The vertical PRO1456 should be inset 1 8 from the end of the ridge beam...

Страница 17: ...ng can be found in the window bundles Roof Vents can be installed in any bay Insert bolts to attach conntecting plate The crossbar should be located about 790mm just over 31 from the connection point...

Страница 18: ...oint of wind brace to PRO1456 with screw after greenhouse is complete and glass is installed X X X X If your windbraces do not reach the proper connection point your greenhouse is not level square mak...

Страница 19: ...pots marked with a red X to secure each piece To attach the elbow to the greenhouse base run a self tappinge screw through the exit hole to the inside of the elbow and into the greenhouse base 17 Secu...

Страница 20: ...hat you can maneuver your ladder better while working Place one piece at a time adding the ridge gasket E400330 at the top and heavy duty gasket PRO1748 after placing each pane on the roof Slide roof...

Страница 21: ...ber trim Shims are only installed in end panels as shown to the right Space the shims 100mm 4 from the top and bottom Polycarbonate units will not use these shims Glazing shims are only used on end pa...

Страница 22: ...A B B B B 4 X E 400330 NO SILICONEN SILICONEN B 4 X PLEASE NOTE Crescent seal E400330 is only installed in the gable eaves and roof as shown with heavy black line to the left It is NOT intended to be...

Страница 23: ...unior Victorian greenhouse includes a single sliding door and 1 2 roof vents depending on the size of the model The other accessories on the following pages are optional and may be ordered such as loc...

Страница 24: ...56 and gable endbar PRO6918 Insert a door stopper into one end of your top door guide insert the second after door is installed Attach bottom door guide to foundation frame See low threshold pages to...

Страница 25: ...23...

Страница 26: ...door needs to be leveled a washer may be inserted on the bolt under the wheel assembly Gasket is only installed on the sides Glass pane slides into frame before attaching the top piece Brush seal slid...

Страница 27: ...4 2 x 19 10 4 2 x 19 OPTION...

Страница 28: ...OPTION SDL1 Page H_37 OPTION Sliding Door Lowered Threshold 26...

Страница 29: ...OPTION SDL2 Page H_38 OPTION Sliding Door Lowered Threshold cont d 27...

Страница 30: ...0 P R O 2 0 7 8 0 4mm GLASS PR O 76 09 P R O 7 6 1 5 P R O 7 6 1 0 Page H_39 Note A 1 inch long bolt is inserted into the lower profile This bolt is for the optional manual or the spindle opener Note...

Страница 31: ...e will slide into the channel of the ridge beam Note Inserting a bolt on either side of the roof window will prevent it from moving side to side Roof Window Installation Standard manual opener shown g...

Страница 32: ...e Ventomax auto opener to fully understand the functioning and maintenance of these unique openers Installing the automatic opener requires 2 bolts to be inserted into the roof crossbar for the lower...

Страница 33: ...Slide the brass part of the opener over the bolt in the window channel Use the supplied nylock nut to secure the opener on the top mounting bolt Finally thread the large side bolts into the U shaped m...

Страница 34: ...TAB2 OPTION STAGING TAB2 32...

Страница 35: ...TAB5 OPTION STAGING TAB5 33...

Страница 36: ...SH OPTION SHELF SH STANDARD ALTERNATIVE M6x15 SCREW 34...

Страница 37: ...ST L 3m50 STANDARD OPTION SEEDBED ST ALTERNATIVE M6x15 SCREW 35...

Страница 38: ...N310_73 24 pcs 24 pcs SUN236_300 93 pcs 93 pcs SUN310_300 93 pcs 93 pcs OPTION Shadecloth May be added after assembly you will need to notch the ridge and gutter profile channels with a 1 2 drill bit...

Страница 39: ...this order In ridge profile o 1 bolt for L bracket that connects at gable end o 1 twist lock optional o 31 Sliding Eye Hooks o Twist lock optional o 1 bolt for L bracket that connects at gable end In...

Страница 40: ...systems be E info janssens alusystems be Customer Service or Assembly Questions Give us a call Toll free 1 877 760 8500 customerservice exaco com Exaco Trading www EXACO com Please watch our animated...

Отзывы: