Faucet Installation
1. Place the faucet through the hole to be installed, then fix it using the matching screws;
2. Take out the connect tube in the accessory bag, insert it to the quick connect of faucet;
3. Connect one end of PE pipe to “purified water” of filter machine and the other end
connect to the quick connect on faucet.
Cartridge Installation
Take out the cartridge and insert it into
the corresponding cartridge housing, turn
right it all to the end, then cartridge
installation is complete.
Note: the corresponding housing is
①
PP
cartridge,
②
GAC cartridge,
③
RO
cartridge,
④
Post carbon cartridge, as
indicated on the right:
Commissioning
1. Close the ball valve on storage tank,
open the water supply and plug the
power, open the faucet, check the boost
pump to see if it is working well( with a
little vibration), wait until the purified water
come out of faucet, close the faucet,
check if there is any leakage around
connector.
2. Open the ball valve on storage tank, let
the water go into the storage tank, do not
stop flushing the pipe line and storage
tank until the water is clean.
3.4 Start-up
1. After installing the machine as per the requirements above, flush the pipeline of
machine thoroughly.
2. Open the inlet valve and the faucet, then you will access the good quality purified
water.
Note: For the reason of the flow rate of produced water is slow, if you need high demand
of water, it may need to wait several minutes or more.
7