Brief instructions for 
initialization

INSTALL ATION INSTRUCTIONS

Safety, Operating manual, Troubleshooting

Before start-up, please read the operating instructions for the SCU control unit 

carefully and pay special attention to the safety notes. The relevant notes an 

operating manual can be found at https://medialibrary.ewellix.com/asset/16223.
www.ewellix.com/en/global/products/linear-actuators/control-units/scu.

Overview and connections for the SCU 
control unit 

Fig. 1

Overview of SCU control unit, without protective cover

1

2

3

5

4

6

7

8

9

10

11

12

13

14

15

16

1.  Housing
2.  Space for software data label
3.  Connection for operating elements (sockets 8, 9, 10)
4.  Connection for 4 external end switches (socket 7)
5.  Fastening for safety protective cover
6.  Cable guides
7.  Installation holes (4)
8.  Under-floor rechargeable battery
9.  Connection for operating actuators and pillars (sockets 1 to 6)
10.  Not occupied (sockets 15, 16)
11.  Not occupied (socket 14)
12.  Optional rechargeable battery connection (socket 13)
13.  Operational voltage indicator (not visible on this image)
14.  Communication interface (socket 12)
15.  Operational earthing bolt (not visible on this image)
16.  Mains connection or connection for source of DC voltage (socket 11)

ewellix.com 

© Ewellix
All contents of this publication are the property of Ewellix, and may not be reproduced or given to third parties (even extracts) without permission. Although great care has been taken in the 
production of this catalog, Ewellix does not take any responsibility for damage or other loss resulting from omissions or typographical errors. The photo may differ slightly in appearance from the 
actual product. Due to continuous improvements being made in our products, the product’s appearance and specifications are subject to change without notice.

PUB NUM TC-08049-EN-April 2021

Initialization process (for standard 
parameters)

1. Connect operating element(s)

Insert the HD15 connector of the operating element carefully and correctly 

into the relevant socket of the SCU control unit (  position 3 in Fig. 1).

2. Connect drive(s)

Insert the connector (DIN8) for the drive into the relevant socket on the SCU 

control unit ( item 9 in Fig. 1). Check that the letter on the marker clip for 

the drive matches the letter on the data label ( position 2 in Fig. 1) of the 

relevant socket.
When using several drives of the same type, the drives must be connected 

according to the desired function.

3. Connect supply voltage

For the AC version: Insert the country-specific mains cable correctly into the 

relevant socket ( position 16 in Fig. 1) of the SCU control unit. For the DC 

version: Connect the wires of the DC cable to a suitable voltage source (the 

DC supply must be short-circuit- proof or suitably protected), polarity: red + 

and blue –.

4. Initialize the system

Press the Up and Down buttons of the first level operating element at the 

same time for 5 seconds. An intermittent signal confirms the action.
Move all the drives connected to the SCU control unit to the zero position by 

pressing the Down button.

WARNING

If initialization is not performed correctly, the system will not operate prop-

erly and this may lead to errors that only become apparent later.

5. Test initialization

To assure correct initialization, you have to move all actuators. There must 

not be any audible alarm and the speed of the actuators must comply with 

the specifications on the datasheet.

Adding, removing, replacing actuators

WARNING

If drives are added, removed or replaced after initialization, the initialization 

process must be repeated.