36
WT.050.590.020.DE.IM.0719
Installation
SFC SC
5.
5.3
Commissioning
5.3.1
Installation guide
Commissioning procedure
Once the unit has been installed the electrical connections can be
made.
The following table contains the individual commissioning steps in
their correct sequence.
More detailed information is contained in the chapters listed in the
"Chapter and page reference" column.
Completion of each task can be confirmed in the "Completed"
column.
Please note
If this installation sequence cannot be complied with, please
contact your contractual partner.
Commissioning
Seq.
no.
Task
Chapter and
page reference
Com-
pleted
1
Electrical connections in
accordance with the wiring
diagrams.
2
Close the housing cover
3
Switch the unit on
4
Set the language
5
If another operating mode is
activated, switch to „MANUAL“
6
Enter system name
(e.g. SFC SC)
7
Set dosing output, and adjust
positioner running time, Tp, and
max. pulses if necessary
8
On positioner with feedback
calibrate „Ym“.
If using feedback signals, such
as mA signal, 0 – 1V, 5kOhm,
the DIP switch S4 on the A&C
board needs to be adjusted.
Factory setting: 1kOhm
potentiometer
Содержание WALLACE & TIERNAN SFC SC
Страница 1: ...WALLACE TIERNAN MEASURING AND CONTROL SYSTEM SFC SC from version V 3 06 INSTRUCTION MANUAL ...
Страница 2: ...2 WT 050 590 020 DE IM 0719 SFC SC Please note Original manual ...
Страница 18: ...18 WT 050 590 020 DE IM 0719 Description SFC SC 3 ...
Страница 42: ...42 WT 050 590 020 DE IM 0719 Installation SFC SC 5 ...
Страница 66: ...66 WT 050 590 020 DE IM 0719 Maintenance SFC SC 7 ...
Страница 72: ...72 WT 050 590 020 DE IM 0719 Wiring Diagrams SFC SC 9 ...
Страница 73: ...SFC SC Certificats 10 73 10 Certificats ...
Страница 74: ...74 WT 050 590 020 DE IM 0719 Certificats SFC SC 10 ...
Страница 75: ...SFC SC Certificats 10 75 ...
Страница 76: ...76 WT 050 590 020 DE IM 0719 Certificats SFC SC 10 ...