26
EVONIC - 104 INSTRUCTION MANUAL ISS. 2
EVONIC - 104 INSTRUCTION MANUAL ISS. 2
4
Screw the two top mounted brackets to the wall.
5
You can now construct your stud wall/s around the appliance in the design of
your choosing.
When constructing the studwork,
remember that the vents on the underside
of the appliance need a minimum of 50mm
clearance beneath them.
Ensure that the appliance isn’t supporting
the weight of the studwork.
Before plasterboarding in the appliance
it is recommended that you create a
maintenance hatch for future access.
Do not use silicones, adhesives, or wet
plaster to seal in the appliance.
Содержание E-Smart Newton 10
Страница 16: ...16 EVONIC 104 INSTRUCTION MANUAL ISS 2 EVONIC 104 INSTRUCTION MANUAL ISS 2 INSTALLATION INSTALLATION...
Страница 28: ...28 EVONIC 104 INSTRUCTION MANUAL ISS 2 EVONIC 104 INSTRUCTION MANUAL ISS 2 LOG LAYOUTS LOG LAYOUTS...
Страница 30: ...30 EVONIC 104 INSTRUCTION MANUAL ISS 2 EVONIC 104 INSTRUCTION MANUAL ISS 2 TROUBLESHOOTING TROUBLESHOOTING...