Evo Prime1 Скачать руководство пользователя страница 1

 

Rev.1                                                                            1 | 

P a g e  

 

 

 

Prime1 & Prime3  

User and Maintenance Manual  

 

 
 

 

Rev 

Date 

Author/s 

Checked 

Date 

20/5/2020  Jack Wright Smith & Richard Smaldino 

JA 

15/6/20 

Содержание Prime1

Страница 1: ...Rev 1 1 P a g e Prime1 Prime3 User and Maintenance Manual Rev Date Author s Checked Date 1 20 5 2020 Jack Wright Smith Richard Smaldino JA 15 6 20...

Страница 2: ...all emergencies 5 3 1 2 For Flooding 5 3 1 3 For fires 5 3 1 4 Other emergencies not covered 5 3 2 Shutdown procedure 5 3 3 Startup procedure 6 4 Maintenance 6 4 1 Filters 6 4 1 1 Air Inlet Vermin sc...

Страница 3: ...nt of battery modules can be increased or decreased within these specific module ranges and these changes must be completed by an installer The Prime1 relates to Single Phase systems and the Prime3 us...

Страница 4: ...Rev 1 4 P a g e 2 Component identification Prime Enclosure Isolation Box Isobox DC Isolator s Inside of Isobox...

Страница 5: ...water even if the system is dry o If system has been submerged product must not be used Dispose of product accordingly 3 1 3 For fires o If safe to do so use ABC or carbon dioxide extinguisher to exti...

Страница 6: ...k to see how regularly each part should be maintained If the user does not feel confident in performing the required maintenance tasks contact your installer to have them complete the maintenance task...

Страница 7: ...k in with the allocated screws 4 1 2 Air filters The air filters are slotted inside the bottom of the prime between the front air inlet vermin screens described earlier There is one on the left side a...

Страница 8: ...ray from side of airbox 4 2 Internal cleaning EVO Prime can be installed in indoor and outdoor locations in a range of different locations so every system experience different temperatures and dust in...

Страница 9: ...Rev 1 9 P a g e 5 Prime Specifications Prime 1...

Страница 10: ...emperatures 2 Useable energy Nominal Energy is based on beginning of battery life at 25 C and at 3C charge discharge rate 3 Please refer to the detailed warranty documentation at the EVO Power website...

Страница 11: ...LOAD PV PANELS SCERT SOLAR INVERTER Comms Comms RCB 10A Temp Switch Fan Fan Thermocouple Battery Restart Button 9V Battery 63A MCB 63A MCB L1 GRID RCB 10A N LOAD L1 LOAD 4 10x LG Chem 6 5kWh Battery...

Страница 12: ...larised Comms L3 LOAD L2 LOAD L1 LOAD PV PANELS SCERT SOLAR INVERTER Comms Comms RCB 10A Temp Switch Fan Fan Thermocouple Battery Restart Button 9V Battery 63A MCB 63A MCB L3 GRID L2 GRID L1 GRID RCB...

Отзывы: