INSTALLATION INSTRUCTIONS
A f f i n i t y 3 0 G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
13
1916"
40mm
1316"
30mm
2734"
704.85mm
7.65in
194.36mm
Shelving or
drawers can
be installed
under Affinity
30G if
desired.
FRONT VIEW
STEP 3:
Construct a bay for the Evo unit with your chosen cabinet system. Position and
fasten the supplied mounting brackets 7.65” below the finished counter top surface.
Metal right angle mounting brackets supplied with unit are
each 1/16” thick. Mount angle brackets as shown. Unit slides
into framework and rests on top side of brackets. Brackets
are slotted for fasteners at each four corners.
Cabinet
Framework
Example: Tiled counter top with substrate.
Finished counter top thickness should be
3 cm (1-1/5”).
COUNTER TOP INSTALLATION (4 of 4)