Step 3
1. Put the firebox (L) onto top of
three legs.
2. Align the holes on the firebox
(L) with the holes on the top
of three legs.
3. Insert one M6x12 bolt (AA),
flat washer (CC) and spring
washer (DD) into each pre-
drilled holes by hand
4. Go back tighten all the bolts
using screwdriver provided.
Step 4
1. Hook the ash pail (M) to the bottom
of firebox ( L) as right shown
Step 5
1. Align the holes on the lid handle(E) with
the holes on the wall of firebox (E).
2. Insert one M6 nut (BB), flat washer
(CC) and spring washer (DD) into each
pre-drilled holes by hand
3. Align the holes on left down hinge (J)
and right down hinge (K) with the holes
on the wall of fire box (E)
4. Insert one M6x12 bolt (AA), M6 nut
(BB), flat washer (CC) and spring
washer (DD) into each pre-drilled holes
by hand
5. Go back tighten all the bolts using
screwdriver provided.
7