background image

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 1

EVERSAN

INC.

SYNERGY

TM

resources

EVERSAN, INC. • 34 Main Street, Whitesboro, NY 13492 • 1-800-383-6060 Fax: 315-736-4058

www.eversan.com

MODEL 93

72

BASEBALL/SOFTBALL SCOREBOARD

INSTALLATION INSTRUCTIONS

These instructions must be followed to ensure correct operation. The warranty will be violated and 

considered null if inspection and operating procedures are disregarded.

Should you require assistance or have any questions, please call (800) 383-6060.

          

Check List

 

Model 93

72

 Scoreboard 

 

Control Console with LCD readout

 

Two Conductor Control Cable (Cabled Systems Only)

 

(4) Mounting Brackets

 

(2) Antenna (Wireless Systems Only)

NOTE:

  Please check that these items are available prior to initial test of the scoreboard. If you are 

missing any items, please 

call (800) 383-6060 for assistance.

Customer Shipping Inspection

A.  Unpack scoreboard.

B.  Unpack cable and control console.

Plug the console cable and console into the console connector on back (see diagram)  

C.  Testing - Remove (4) four screws holding the access panel on the 120VAC box. There is a 

standard 120-volt plug for testing. After testing cut connector provided.  Match colors on power 

cable provided to three wires on 120V box. This board requires 120VAC at approximately 6 

AMP. (see diagram)

NOTE:  FAILURE TO TEST SCOREBOARD PRIOR TO INSTALLATION               

                           

WILL VOID ALL WARRANTEES.

Power scoreboard using 120VAC and test scoreboard using the operating instructions provided. 

SHOULD THERE BE A MALFUNCTION OR SHIPPING DAMAGE,

NOTIFY THE SHIPPER AND EVERSAN IMMEDIATELY.

Installation

   

 

 

 

 

 

 

 

 

Отзывы: