12
Installation - Flush Mount
1.
Paste the drilling template on the ceiling or wall. Please refer to the drilling template below.
2.
Use the appropriate tool to drill the OUTER holes; carefully cut along the dashed circle to create a
clearance hole for the inner base unit.
Note:
The minimum recommended material thickness is 1 cm.
3.
Pull the cables to be connected to power and video cables from ceiling. Attach the power pigtail
adapter if necessary.
4.
Remove dome cover (hex, captive screws)
This Manual: http://www.manuallib.com/file/2673673