EVAPCO PHC-D-E Скачать руководство пользователя страница 5

5

PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS

W

H

W

H

Figure 4

 — D Model Basin Section 

24’ (7.3 m) and 26’ (7.9 m) Long

Extended Lifts 

The recommended method for extended lifts is to use safety slings under the unit (see 

Figure 5

). Spreader bars should always be 

used between the cables at the top of the section to prevent damage to the upper flanges.

NOTE:

  

The lifting points should be used for final positioning only and for lifting where no danger exists. If they are used for 

extended lifts, safety slings and spreader bars should be provided under the sections as shown.

Safety slings, spreaders, and skids should be removed before final positioning of the unit.

SAFETY SLING

Figure 5

 — Proper Rigging Method for Extended Lifts

SIDE FLANGE

Single Strip Over

Hole Centerline

END FLANGE

Two Sealer Strips

Overlapping

Figure 6

 

— Proper Sealer Tape Application

Figure 3

 — S Model Basin Section 

9’ (2.7 m), 12’ (3.6 m) and 18’ (5.5m) Long

Содержание PHC-D-E

Страница 1: ...PHC E SERIES Rigging Assembly Instructions FORCED DRAFT EVAPORATIVE CONDENSERS...

Страница 2: ...allation practices prior to rigging and assembly The information in this bulletin is for informational purposes only These instructions do not purport to cover all variations and possible contingencie...

Страница 3: ...has not been altered Should the field inspection indicate the section alignment square has been altered please contact the factory or your local EVAPCO sales representative for additional instruction...

Страница 4: ...to PHC S1182 PHC D621 to PHC D2050 PHC L463 to PHC L842 AIR IN AIR IN A AIR IN AIR IN AIR IN AIR IN C B Figure 1 Recommended Steel Support for S Models Figure 2 Recommended Steel Support for D Models...

Страница 5: ...ting points should be used for final positioning only and for lifting where no danger exists If they are used for extended lifts safety slings and spreader bars should be provided under the sections a...

Страница 6: ...ECTION S AS SHOWN IN FIGURES 7 and 8 The bottom of the spreader beam must be a minimum dimension H above the lowest lifting ear to prevent undue strain on the lifting ears and the section structure Th...

Страница 7: ...isturbed Place drift pins see Figure 9 in at least three of the corner mounting holes and gradually lower the coil section into place using the drift pins to guide the section down accurately onto the...

Страница 8: ...ve is preset at the factory however adjustment should be checked after rigging The float valve should be adjusted so that the center of the float is 1 below the center of the overflow connection when...

Страница 9: ...esult of improper water treatment control during the startup of new equipment The initial commissioning and passivation period is critical for maximizing the service life of galvanized equipment EVAPC...

Страница 10: ...10 PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS NOTES...

Страница 11: ...11 PHC PARALLEL HYBRID EVAPORATIVE CONDENSERS NOTES...

Страница 12: ...Inc Edwardsville KS USA 913 322 5165 marketing evaptech com Tower Components Inc A wholly owned subsidiary of EVAPCO Inc Ramseur NC USA 336 824 2102 mail towercomponentsinc com EVAPCO Alcoil Inc A wh...

Отзывы: