Operation and maintenance manual
Scope of works
Electrically operated roller blinds:
Operation & maintenance of electric operated roller blind(s) with Serena® 170 system
Materials schedule
1. Serena® 170
Страница 1: ...Operation and Maintenance for motorized roller blind Serena 170...
Страница 2: ...Table of Contents Chapter Description Scope of Works Materials schedule Maintenance Parts...
Страница 3: ...Operation and maintenance manual Scope of works Electrically operated roller blinds Operation maintenance of electric operated roller blind s with Serena 170 system Materials schedule 1 Serena 170...
Страница 4: ...x sensor for sun related movements Readjustment of limits via remote once programmed and installed Step wise mode for precise limits Parallel connection possible Intermediate position Motors in Serena...
Страница 5: ...become jammed or obstructed before operating your roller blind s If the blind is getting jammed or obstructed press the stop button to avoid damage to the fabric and or window frame If the blind and o...
Страница 6: ...cles per day every 3 Months Up to 20 cycles per day every 4 Months Up to 10 cycles per day every 6 Months Parts ELECTRICALLY OPERATED ROLLER BLINDS 1 Mounting brackets 2 Motor 3 Guidewire 4 End plug 5...