European Home E4-SA-WS-80 Скачать руководство пользователя страница 18

18

INSTALLATION

External Roof-mounted Power Vent System        

                                                                                                                                            European

Home

.com

DIP Switch

Figure 11.  

PV-GS-CM-ADC 100 Fan Speed and DIP Switch

Inside the PV-GS-CM-ADC 100 is mounted a system board in the upper right corner of which is mounted a fan speed 

potentiometer and a bank of three DIP switches. Each of the three DIP switches should be set as follows: 

- 1 (Left) 

OFF

 

- 2 (Center) 

ON 

- 3 (Right) 

ON

The 

ERPVS 

must be set to produce at least 0.05” w.c. of 

negative

 draft pressure. After connecting a manometer (not included) to 

the system (follow the instructions for the manometer) adjust the fan speed potentiometer until -0.05” w.c. pressure is reached. 

Final Step:

 Ensure all connections are correct, secure all parts and test system for proper operation.

f i r e - p a r t s . c o m

Содержание E4-SA-WS-80

Страница 1: ...plosion may result causing property damage personal injury or loss of life INSTALLER Leave this manual with the appliance CONSUMER Retain this manual for future reference Installation Operation and Owner s Manual August 16 2017 External Roof mounted Power Vent System Please read this manual thoroughly before beginning the installation It has information which is important for safe installation and...

Страница 2: ...d Power Vent System EuropeanHome com TABLE OF CONTENTS Important Safety Information 3 Product Information 4 Venting Requirements 8 Installation 11 Operating the System 19 Troubleshooting 20 Warranty Appendix A fire parts com ...

Страница 3: ...injury or property damage TO REDUCE THE RISK OF FIRE ELECTRICAL SHOCK OR INJURY TO PERSONS OBSERVE THE FOLLOWING 1 This system is intended for use with European Home products ONLY 2 Beforeservicingorcleaningtheunit switchtheelectricservice off at the load center and lock the load center to prevent the power from being switched on accidentally 3 Installation work and electrical wiring must be done ...

Страница 4: ...tes negative pressure within the venting is bolted to the PV VM FMA 01 fan mount which in turn is fastened to the customer provided venting chase Inside of the building the PDS 1 proven draft switch senses the draft pressure and signals the system control Once the draft has been established the solenoid valve is opened the ready light is lit and the fireplace can be operated as usual The above com...

Страница 5: ...d with gas or oil fired appliances where it can be interlocked with the gas supply valve or the safety or control circuit of the appliance Construction The enclosure the switch housing and the internal switch are made of polycarbonate The diaphragm is made of NBR silicone while the switching contact is made in fine silver Listings The switch is UL recognized product 1 2 Components Standard packing...

Страница 6: ...d as at least three 3 vent diameters A 3 V see figure below To prevent condensation from entering the probe or PDS when installed on a horizontal stack the probe must be installed above the centerline of the stack For fireplace installations the stack probe should be ENERVEX ENDURA PLASTICS XP042105 1 1 REV A 0 05 WC PR MOUNT DIAPHRAGM VERTICAL U R Mounting holes Connection for tubing at the botto...

Страница 7: ...rnal Roof mounted Power Vent System EuropeanHome com 7 Rain Shield Exhaust Connector Fan Mount Stack Probe Mounting Holes High Temperature Grommet inside Figure 1 Exploded View of PV VM FMA 01 Fan Mount Assembly fire parts com ...

Страница 8: ...ured between the top of the fireplace and the top of the PV VM FMA 01 fan mount Only M G DuraVent brand direct vent components are approved for use with the ERPVS The venting may have no more than five 90 degree elbows or ten 45 degree elbows or a combination not exceeding 450 degrees of elbow The venting may turn down but it must not go below the base of the fireplace See illustration below The v...

Страница 9: ... REQUIREMENTS 9 External Roof mounted Power Vent System EuropeanHome com Figure 3 Configuration is NOT Permitted Too Many Elbows Figure 4 Configuration is NOT Permitted Venting Goes Too Far Down fire parts com ...

Страница 10: ...o 14 12 5 0 1 52 14 12 to 16 12 6 0 1 83 16 12 to 18 12 7 0 2 13 18 12 to 20 12 7 5 2 29 20 12 to 21 12 8 0 2 44 VERTICAL VENT TERMINATION CLEARANCES Termination Heights forVents Above Flat or Sloped Roofs Horizontal Overhang Vertical Wall Roof Pitch is X 12 1 25 4mm Minimum Clearance to Combustibles onVertical Sides ofVent ConcentricVent Pipe H MINIMUM HEIGHT FROM ROOF TO BASE OF FAN MOUNT The ve...

Страница 11: ...essible through the small of the plastic enclosure Connect tubing to the NEGATIVE port on the PDS Factory wiring comes with three wires that are already crimped onto the PDS The purpose of these wires is to provide a point in which you can extend the length of the wire by using wire nuts and additional wire not provided 3 2 Installation of Stack Probe for PDS 1 A stack probe is used with ENERVEX P...

Страница 12: ...ing must be in flexible or rigid metal conduit LEGEND 24 VAC 120 VAC WEATHERPROOF BOX N L FAN SPEED CONTROL ORANGE Danger Turn off electrical power before servicing Contact with live ele cause shock or death All electrical wiring must be in accordance with requirements of authority having jurisdicti requirements with National Electrical Code NFPA 70 latest edition If an external elec system must b...

Страница 13: ...MPER SOLD SEPARATELY Fig 1 4 MOUNTING HOLES 5 0 in 127 mm 8 9 in 227 mm Fig 2 ENERVEX 5 3 2 Mounting the Control Unit The ADC100 control may be mounted directly to a wall To mount remove the cover and locate the 4 mounting holes Using the hole pattern shown below mount the control using 6 screws Once it is attached wire the unit in accordance with Chapter 4 ENERVEX ENERVEX ADC100 PDS1 ADC100 DAMPE...

Страница 14: ...ualified licensed electrician Electric power must be turned off when making connections or performing any service Note The PV GS SGV 02 must be installed between the shutoff valve and the fireplace gas control valve in such a way as to ensure proper gas flow into the fireplace Do not place the PV GS SGV 02 inside the combustible material zone around the fireplace The PV GS SGV 02 must be connected...

Страница 15: ...re 9 If provided this switch controls the fan so the system will not work when this switch is off Note 1 x 120V AC N Enervex RSxx DISCONNECT by others FAN OUT 24VDC AUX 1 IN ADC100 AC IN L1 POWER SWITCH 1 2 7 10 9 8 5 4 AUX 1 OUT 23 22 PDS IN 13 12 11 PDS 1 NO NC C DAMPER PROVE 17 16 SOLENOID GAS VALVE INDICATOR LAMP A run capacitor is included inside the junction box attached to the fan This run ...

Страница 16: ...vered as two devices light and switch Ç Ç On Off E4 SA WS 80 This part has a 26 ca ble which may NOT be extended con nectedtothefireplace control Gas Control PV GS SGV 01 This part must be installed in the gas supply upstream of the fireplace Fireplace Power Vent PV GS CM ADC 100 This part must be in stalled indoors PDS This part must be installed indoors fire parts com ...

Страница 17: ...ule The PV ES PLS WHT system switch should be placed next to E4 SA SW 80 wall switch for convenience The PV GS SGV 02 solenoid valve must be connected as close as practical to the gas control valve and after as the gas flows the gas shutoff valve The PDS 1 stack probe may be extended up to 25 feet by using 1 4 rigid plastic or copper tubing as temperature allows not supplied The PDS 1 must be wire...

Страница 18: ... of three DIP switches Each of the three DIP switches should be set as follows 1 Left OFF 2 Center ON 3 Right ON The ERPVS must be set to produce at least 0 05 w c of negative draft pressure After connecting a manometer not included to the system follow the instructions for the manometer adjust the fan speed potentiometer until 0 05 w c pressure is reached Final Step Ensure all connections are cor...

Страница 19: ...SA WS 80 wall switch or the remote control The E4 SA WS 80 wall switch has three buttons on it On Off UP flame DOWN flame Press the On Off button to begin the star up sequence After the main burner has lit the UP flame or DOWN flame button may be used as desired Note that on multiple burner models the secondary burner s cannot be controlled by the wall switch the remote control must be used TURNIN...

Страница 20: ... begins to open Once open the damper prove contact closes Terminals 16 and 17 3 The ADC100 begins to ramp up the fan 4 The Proven Draft Switch closes when adequate draft is achieved and ADC100 adjusts fan to speed setting on the potentiometer 5 The ADC100 control releases the appliance for operation by closing dry contact between terminals 22 and 23 and terminals 29 and 30 Operating Manual Mode Se...

Страница 21: ...nce and Troubleshooting 5 3 Operating Pressure The operating pressure of the ADC100 Control is determined by the PDS switch The PDS 1 used with the ADC100 has a pressure setting of 0 05 W C 0 03 W C As long as the pressure is within this range the fireplace and or appliance will continue to operate Should the pressure fall outside of this range it may be necessary to adjust the fan speed The user ...

Страница 22: ...e of replacement or repair whichever provides longer coverage for you When a product or part is exchanged any replacement item becomes your property and the replaced item becomes the property of European Home All warranty claims must be submitted through the dealer from which you purchased the product Check with your dealer in advance for any costs to you when arranging a warranty call Shipping an...

Страница 23: ...NOTES fire parts com ...

Страница 24: ...rnal Roof mounted Power Vent System EuropeanHome com IGEPVSIOOM 170816 EUROPEAN HOME a division of Europa Ja Inc 30 Log Bridge Road Building 300 Suite 303 Middleton MA 01949 www europeanhome com fire parts com ...

Отзывы: