00026286.DOC, Version 2.1
15/16
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
The trussing system must always be earthed!
5.2 Connections
Connection with the mains
To connect the device to the mains, you will need a power cord with a 5-pole 380-400 V 16A CEE plug.
DANGER TO LIFE!
The electric connection must only be carried out by a qualified electrician!
Outputs
Output is via 6 safety sockets. Connect your loads to the output sockets. The maximum load per phase is
3,680 W (resistive). Please note that the maximum current must never be exceeded. The feed-through
output (5-pole 380-400 V 16A CEE connector) can be used to connect a further power split box.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
6. CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
Disconnect from mains before starting maintenance operation!
DANGER TO LIFE!
We recommend a frequent cleaning of the device. Please use a moist, lint-free cloth. Never use alcohol or
solvents!
There are no serviceable parts inside the device. Maintenance and service operations are only to be carried
out by authorized dealers.
Should you need any spare parts, please use genuine parts.
The examination intervals for mobile electrical devices (German BGV A2) must be kept.
The operator has to make sure that the electrical devices are examined by an electrician before taking into
operation for the first time and after changes before taking into operation another time.