00070199.DOC, Version 1.0
9/10
but instead use a professional structural rigger. Improper installation can result in bodily injury and or
damage to property.
Caution:
Devices in hanging installations may cause severe injuries when crashing down! If you have
doubts concerning the safety of a possible installation, do NOT install the device!
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
Attachment
Before attaching the device, make sure that the installation area can hold a minimum point load of 5 times
the device's weight.
The mount must be installed out of the reach of people.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the ceiling/wall material. Always ask a specialist for the correct plug/screw combination indicating the
maximum load and the building material.
Procedure:
Step 1:
On the mount, there are holes for the installation.
Step 2:
Hold the mount onto the location where it is to be installed.
Step 3:
Mark the boreholes with a pen or a suitable tool.
Step 4:
Drill the holes.
Step 5:
Hold the mount in the desired position and tighten the screws.
Step 6:
Install the projector on the mount.
Attaching the projector
Always refer to the projector user manual before attaching the mount!
The number of fasteners used will vary, depending upon the type of projector.
Multi-washers and spacers may not be used, depending upon the type of screen.
Please note that some projectors must not be inclined over a certain degree due to thermal reasons.
CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
Observe prescribed testing deadlines:
1. Once a year by an expert
2. Every four years by a skilled person
3. Before every use for breakage and function by the operator
Should you have further questions, please contact your dealer.