The installation of the mirrorball has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.

When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.

The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.

The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.

Attachment

The rotary motor should be installed outside areas where persons may walk by or be seated.

IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the mirrorball. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.

The motor must only be installed at a vibration-free, oscilation-free and fire-resistant location. By using a
water-level, make sure that the motor axle points exactly to the bottom.

The motor and the mirrorball have to be installed out of the reach of people.

Caution:

 Mirrorballs may cause severe injuries when crashing down! If you have doubts concerning the

safety of a possible installation, do NOT install the motor!

Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's load (e.g. maximum load 1 kg - point load 10 kg).

The mirrorball motor must always be installed in a stable way. Do only use an appropriate hook and make
sure that the hook is properly connected with the ground.

The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.

Procedure:

Step 1:

 The holes for the installation are on the base of the motor.

Step 2:

 Hold the baseplate onto the location where the device is to be installed.

Step 3:

 Mark the boreholes with a pen or a suitable tool.

Step 4:

 Drill the holes.

Step 5:

 Hold the device in the desired position and tighten it.

DANGER TO LIFE!

Before taking into operation for the first time, the installation has to be approved by an expert!

The maximum load may never exceed 0.5 kg. This corresponds to EUROLITE mirrorballs with a diameter of
15 cm.

Содержание 50301090

Страница 1: ...Copyright Nachdruck verboten Reproduction prohibited F r weiteren Gebrauch aufbewahren Keep this manual for future needs BEDIENUNGSANLEITUNG USER MANUAL Motor for Mirror Ball LED FC...

Страница 2: ...e Bedienungsanleitung gilt f r die Artikelnummer This user manual is valid for the article number 50301090 EINF HRUNG Wir freuen uns dass Sie sich f r einen EUROLITE Motor f r Spiegelkugel LED FC ents...

Страница 3: ...t handelt es sich um einen Drehmotor mit dem sich Spiegelkugeln bis zu einem Maximal durchmesser von 15 cm drehen lassen Die Maximalbelastung darf dabei keinesfalls 0 5 kg berschreiten Dieses Produkt...

Страница 4: ...t auskennen Wenn Ger te nicht mehr korrekt funktionieren ist das meist das Ergebnis von unsachgem er Bedienung Reinigen Sie das Ger t niemals mit L sungsmitteln oder scharfen Reinigungsmitteln sonder...

Страница 5: ...itsinspektionen des verwendeten Materials und der Spiegelkugel Versuchen Sie niemals die Installation selbst vorzunehmen wenn Sie nicht ber eine solche Qualifikation verf gen sondern beauftragen Sie e...

Страница 6: ...ten Sie darauf dass die Rotation der Spiegelkugel nicht durch Dekorationsteile etc abgebremst oder unterbrochen wird Achten Sie darauf dass niemals Seitenkr fte auf die Installation einwirken k nnen E...

Страница 7: ...Um die Batterien auszutauschen beachten Sie bitte die Hinweise unter Einlegen Wechseln der Batterie Sollten einmal Ersatzteile ben tigt werden verwenden Sie bitte nur Originalersatzteile Sollten Sie...

Страница 8: ...lnummern This user manual is valid for the article numbers 50301090 INTRODUCTION Thank you for having chosen a EUROLITE Motor for Mirrorball LED FC If you follow the instructions given in this manual...

Страница 9: ...eter of 20 cm The maximum charge of the whole installation must not exceed 1 kg This product is only allowed to be operated with 3 x AA 1 5 V batteries and was designed for indoor use only The motor a...

Страница 10: ...ibed in this manual the product may suffer damages and the guarantee becomes void Furthermore any other operation may lead to dangers like burns crash etc INSTALLATION Inserting Replacing the battery...

Страница 11: ...rty The motor must only be installed at a vibration free oscilation free and fire resistant location By using a water level make sure that the motor axle points exactly to the bottom The motor and the...

Страница 12: ...On the side of the Motor for Mirrorball LED FC you can find a 3 step mode selector with the following functions All on 0 All off Sound controlled beam movement The Motor for Mirrorball LED FC features...

Страница 13: ...ty 0 5 kg Maximum diameter of mirror ball 15 cm EUROLITE Rotation speed approx 10 11 RPM Diameter 130 mm Height 75 mm Weight 0 2 kg Accessories No Mirror ball 15cm 50100210 Mirror ball 15cm gold 50120...

Отзывы: