
© EUROHEAT DISTRIBUTORS (H.B.S) LTD July 2012
E & OE Instructions Part number IN1115 Edition G7
6
Stoves Construction
The plexus control is the centre of the air inlet system. The fuel select lever, controls the direction of air flow,
either air wash or under grate. The burning rate control governs the amount of air entering the fire.
Top Chamber Baffle
Ash Pan Door
Riddling Actuating Rod
Air Direction lever
Air Volume Control
Remote Control
Motor
Fuel Guard
Grate
Plexus Control
Assembly
Internal Cast Iron
Protection Plates
Top Flue Option
Rear Flue Option
Pre Heated
Primary Air
Useful Organisations UK
Solid Fuel Association
0845 601 4406
www.solidfuel.co.uk
The National Association of Chimney Sweeps
01785 811732
www.chimneyworks.co.uk
HETAS
Ltd.
0845
634
5626 www.hetas.co.uk