background image

 
 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

GAMME INDUSTRIE 

INDUSTRY LINE 

REFROIDISSEUR D'AIR 

AIR CHILLER 

V 1.1 

Mise à jour le 06/11/2012

 

Updated 06/11/2012 

KR 

 

MANUEL D’INSTALLATION ET D’UTILISATION 

 

 

 

        

INSTALLATION AND OPERATING INSTRUCTIONS 

Содержание KR 10 MONO

Страница 1: ...GAMME INDUSTRIE INDUSTRY LINE REFROIDISSEUR D AIR AIR CHILLER V 1 1 Mise à jour le 06 11 2012 Updated 06 11 2012 KR MANUEL D INSTALLATION ET D UTILISATION INSTALLATION AND OPERATING INSTRUCTIONS ...

Страница 2: ...sseurs 11 Ne pas forcer le fonctionnement en shuntant les sécurités électriques 12 Avant d effectuer toute opération d inspection de maintenance ou de nettoyage s assurer que l unité est hors tension 13 Seul un frigoriste qualifié et agréé peut intervenir sur le circuit frigorifique Au contact d une flamme vive le gaz frigorifique devient toxique et hautement dangereux Autres indications générales...

Страница 3: ...ge peut causer des pannes qui compromettent le bon fonctionnement du refroidisseur Avant de monter le refroidisseur vérifier que la position d installation de l armoire et du refroidisseur permet de bonnes conditions de circulation de l air le lieu d installation n est pas trop sale ou humide l alimentation électrique est appropriée aux caractéristiques indiquées sur la plaque signalétique la temp...

Страница 4: ... seuil d alarme à été atteint à l intérieur de l armoire Il est pré réglé en usine à 55 C mais peut être facilement réglé sur d autres températures Le circuit frigorifique est composé d un système hermétiquement fermé et ne requiert pas d entretien Ce circuit est chargé en gaz et testé en usine Les ventilateurs ne requièrent pas d entretien ils sont montés sur des roulements à billes protégés cont...

Страница 5: ...o magnetic switch on power supply line 8 Connect the unit with indicated voltage see data sheet 9 Ensure that power cable section is in conformity to unit s intensity 10 Reduction in voltage during starting of the unit can damage to compressor motor s of the unit 11 Do not operate without ensuring electrical safety 12 Before any inspection always check that power is switch off 13 Do not try to rep...

Страница 6: ...t air are not obstructed circuit is fitted in horizontal position with maximum tilt of 2 send connection for condensates evacuation electrical connection are done by qualified authorized technician to avoid accumulation of condensate a switch is fitted on the door in order to stop conditioner operating if the door is open Important To ensure durable fixation mounting surface between the conditione...

Страница 7: ...ction test Fans do not require maintenance they are mounted on ball bearings protected against humidity and dust and equipped on thermal protector Expected life is 30 000 hours Only external fan according to degree of impurity which they are subjected must be periodically cleaned with compressed air Use of filter is appropriate if there are impurities in the air Warning before beginning any mainte...

Страница 8: ...PLAN D ENCOMBREMENT DIMENSION DRAWING ...

Страница 9: ...KR 10 17 20 MONO KR 40 MONO ...

Страница 10: ...KR 17 20 40 TRI ...

Страница 11: ......

Страница 12: ... service eurodifroid fr SIEGE SOCIAL ET SERVICES TECHNIQUES FACTORY ZI SUZEROLLES 49140 SEICHES SUR LE LOIR Tél 33 0 2 41 76 28 40 Fax 33 0 2 41 76 28 41 DIRECTION ADMINISTRATIVE COMMERCIALE ADMINISTRATIVE COMMERCIAL DIRECTION 105 Boulevard Chanzy 93100 MONTREUIL Tél 33 0 1 49 20 87 00 Fax 33 0 1 49 20 87 01 ccial eurodifroid fr ...

Отзывы: