Eureka Jindara Скачать руководство пользователя страница 2

 

 

 

Non-combustible

hearth

Breast plate no

thicker than 30mm

 55 (appliance

to mantle upright)

 250

2

 

p

e

t

S

1

 

p

e

t

S

Plaster, timber, MDF etc.

Minimum 9mm thick 

cement sheet, villaboard

or non-combustible

material on front face

of framing

Non-combustible material can 

overlap clearance gap between 

ZCC and frameing, and run over 

the front of the ZCC. DO NOT 

silicon or adhear material to ZCC

as heat expansion of ZCC will 

cause cracking.

Vent (optional) - Position vent 

such  that access  is 

available to fan power 

supply when vent is 

removed. 

Hearth depth

mm in front 

of unit 

Vent may be 

located in the

wall of on the floor. 

 Zero Clearance 

Cabinet Installation 

ZCC Part No. 232367

To suit Insert Models: Pearl & Tilga 

1500

1410

Door

Removable fascia

Mantle only 

hot air deflector

M8 cap screw

• 10” Upstands

55mm

97mm

• 8” Upstand

425mm

370mm

10”

8”

450mm

385mm

6 inch Flue Kit

Spigot

3rd Skin

2nd Skin

1st Skin

Heater

10” Gal Flue

8” Gal Flue

6˝ S/S Flue

4th Skin

Minimum Requirements:

Note: Some states will use different 

size flue kits which will require the 

appropriate upstande.

10” Upstand

8” Upstand

 5 x 6” S/S Flue

 4 x 8” Gal Flue

 4 x 10” Gal Flue

Sheet 2 NEXT 2 GPN 232738 Rev.*

Отзывы: