background image

3

Do not use this machine for any operation which 

is not described in the Operation manual.
If you have any questions about the operation of 

this machine, contact the Etnyre Service Depart-

ment at 1-800-995-2116 or 1-815-732-2116.
Operations that are not approved could cause 

serious injury or death.

Important

The instructions represented here are a guide and not 

designed to be comprehensive. Refer to M-114-12R 

Centennial Asphalt Distributor Operation, Maintenance and 

Safety manual for complete instructions.
This pamphlet is provided as a tool to aid personnel in the 

operation of the Etnyre Blacktopper Centennial Distributor, 

as with any type of construction equipment, there are certain 

hazards associated with improper or careless operation. 

The ability to read and understand the instructions should 

be a required qualification to become an operator. There 

are also functions that require a certain amount of physical 

strength to accomplish. Persons lacking the required 

strength may not only place themselves in jeopardy, but 

also others in the vicinity. Read and understand the Safety 

precautions found in M-114-12R Centennial Asphalt 

Distributor Operation, Maintenance and Safety manual 

before operating this machine.
If you have any questions regarding this pamphlet or the 

operation of your unit, contact your Etnyre dealer or the  

E. D. Etnyre Service Department at 1-800-995-2116.

WARNING

Contents

Bar Suck Back Override  ................................ 4
Control Panels ................................................ 5
Fill through Manhole ....................................... 6
Fill through Fill Line ........................................ 7
Circulate In Tank ............................................. 8
Circulate In Bar ............................................... 9
Spray ............................................................ 10
Suckback Spraybar ...................................... 11
Handspray .................................................... 12
Handspray Suckback.................................... 13
Unload .......................................................... 14
Transfer ........................................................ 15
Flushing ........................................................ 16
Flushing Bar ................................................. 17
Front Fill (optional equipment) ...................... 18
Etnyre Spray Bar Nozzles ............................ 19

Содержание Centennial A-130-12R

Страница 1: ...llinois 61061 Phone 815 732 2116 Fax Sales 815 732 7400 email sales etnyre com www etnyre com Centennial Flow Charts and Control Positions ON OFF A 130 12R Serial Numbers S5613 and up Revised 15 May 2020 Variable Width Spraybar with BT 1 Controls ...

Страница 2: ... 4 0 to 7 5 3 3351009 S36 5 V Slot 18 45 81 2 04 7 0 to 10 0 4 3352368 Multi Material V Slot 15 40 68 1 81 6 0 to 9 0 5 3351015 3 32 Coin Slot 15 40 68 1 81 6 0 to 9 0 6 3352204 Multi Material V Slot 35 95 1 58 4 30 12 0 to 21 0 7 3355154 End Nozzle use with 3352204 nozzle 35 95 1 58 4 30 12 0 to 21 0 8 3355010 Multi Material V Slot 29 72 1 31 3 26 10 0 to 165 9 3352205 Multi Material V Slot 20 55...

Страница 3: ...ity to read and understand the instructions should be a required qualification to become an operator There are also functions that require a certain amount of physical strength to accomplish Persons lacking the required strength may not only place themselves in jeopardy but also others in the vicinity Read and understand the Safety precautions found in M 114 12R Centennial Asphalt Distributor Oper...

Страница 4: ... 1 Turn the SUCK BACK OVERRIDE switch ON 2 Press START The pump will start turning at the desired rate 200 GPM is recommended 3 If complete bar suck back is desired follow the instructions for bar suck back beginning with the opening of the left bleeder valve Otherwise continue to the next step 4 Turn the SUCK BACK OVERRIDE switch OFF 5 Press START The pump will start turning at the desired circul...

Страница 5: ...g AUTO PUMP CONTROL or turning ON either POWER switches front or rear 5 Function knob When the desired operation is se lected through this knob the asphalt pump stops turning if the PUMP CON TROL is in AUTO and all automatic valves tank valve 4 way valve bar suck back valves and balance valves are set for the desired operation The asphalt pump rate is set to the stored preset for the desired opera...

Страница 6: ...6 ON OFF Load through Manhole Keyway in 12 o clock position 4 Way Valve HOME ...

Страница 7: ...hrough Load Line Keyway in 12 o clock position 4 Way Valve LOAD Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to LOAD position Push START switch ...

Страница 8: ...Tank Keyway in 12 o clock position Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to BAR CIRCULATE position Push START switch 4 Way Valve TANK CIRCULATE ...

Страница 9: ... Bar Keyway in 9 o clock position Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to BAR CIRCULATE position Push START switch 4 Way Valve BAR CIRCULATE ...

Страница 10: ...10 ON OFF Spray Keyway in 6 o clock position with spray switch On 4 Way Valve BAR CIRCULATE NOTE Unit should already be operating in Bar Circulate and circulating oil to be ready to spray ...

Страница 11: ...ve it open until you hear a positive indication of vacuum at the valve After closing the valve repeat the procedure on the opposite wing Keyway in 12 o clock position 4 Way Valve SUCKBACK Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to SUCKBACK position Push START switch ...

Страница 12: ...ition 4 Way Valve HANDSPRAY Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to HANDSPRAY position Push START switch Cab Panel POWER switch ON 50 GPM adjust using VALUE switch ...

Страница 13: ...k position 4 Way Valve SUCKBACK Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to SUCKBACK position Push START switch Cab Panel POWER switch ON 200 GPM adjust using VALUE switch ...

Страница 14: ...PUMP SPEED knob zero fully counterclockwise Function Switch to TANK CIRCLATE position Push START switch Operate pump 10 GPM in Manual to allow pump to circulate material to prevent pump from getting too cold if possible Connect Load Line to the Storage Tank pump or distributor you wish to transfer to Do not remove Load Line cap if front or rear tank valve is open ...

Страница 15: ...d with Pump Keyway in 12 o clock position Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to UNLOAD position Push START switch 4 Way Valve UNLOAD ...

Страница 16: ...nsfer Keyway in 12 o clock position 4 Way Valve TRANSFER Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to TRANSFER position Push START switch ...

Страница 17: ...Way Valve LOAD Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to LOAD position Push START switch WASH PUMP switch optional ON Cab Panel POWER switch ON 100 GPM adjust using VALUE switch ...

Страница 18: ...ay Valve FLUSH Keyway in 9 o clock position Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to FLUSH position Push START switch WASH PUMP switch optional ON ...

Страница 19: ...4 Way Valve Tank Circulate Keyway in 12 o clock position Rear Panel POWER switch E Stop ON PUMP CONTROL switch AUTO PUMP SPEED knob zero fully counterclockwise Function Switch to LOAD position FRONT LOAD switch optional OPEN Push START switch ...

Страница 20: ......

Отзывы: