
6
User’s
Manual
LEDs
State
Indication
Steady
Power feeding in
PWR
Off No
power
Steady
A valid network connection established.
LNK stands for LINK.
Flashing
Transmitting and receiving data.
ACT stands for ACTIVITY
.
LNK/ACT
Off
Neither connection nor activity existing.
Installation
This chapter gives step-by-step installation instructions for the Converter.
Selecting a Site for the Equipment
As with any electric device, you should place the equipment where it will not
be subjected to extreme temperatures, humidity, or electromagnetic
interference. Specifically, the site you select should meet the following
requirements:
- The ambient temperature should be between 32 and 113 degrees
Fahrenheit (0 to 45 degrees Celsius).
- The relative humidity should be less than 95 percent, non-condensing.
- Surrounding electrical devices should not exceed the electromagnetic
field (RFC) standards for IEC 801-3, Level 2 (3V/M) field strength.
- Make sure that the equipment receives adequate ventilation. Do not
block the ventilation holes on each side of the equipment.
- The power outlet should be within 1.8 meters of the product.
Connecting to Power
This Converter is a plug-and-play device.
Step 1: Connect the supplied AC to DC power adapter to the receptacle at
the back of the converter.
Step 2: Attach the plug into a standard AC outlet.