Begin Hoist Installation
8
Shift sections together
3. Reinsert the clevis pins into the retaining holes to secure the sections.
Reinsert
clevis pins
4. Position the splice plates so they align with the four screw holes in the tube extrusion.
Using a Phillips screwdriver, secure each splice plate with the four M5 screws. (The splice
plates and screws are in a bag that is packaged in the TwinLine clamp box.)
Remove cotter pin
Position splice plates
5. Remove the tape and cotter pin from the hoist section with the splice cover.
6. Slide the splice cover so it is centered on the two hoist sections.
Slide splice cover
7. Using a 2.5 mm hex key, secure the splice cover on each side of the tube with the
provided set screws.