background image

ETC Setup Guide

EBDK Reset Switch

EBDK Reset Switch

Page 3 of 3

ETC

Install EBDK Reset Switch for an MPLD2

1:

Install the back box according to standard electrical practices. The back box should be installed flush 
and square for best installation results.

2:

Punch or drill an appropriate hole for conduit entry on the low-voltage (lower-left) side of the MPLD2.

3:

Remove the four screws that secure the lower cover on the left side of the MPLD2, and then remove 
the cover (see image below).

4:

Remove the jumper from the Remote Restore Switch terminal block.

5:

Terminate two 1.5 mm

2

 (16 AWG) wires to the OUT and RTN terminals on the Remote Restore 

Switch terminal block.

6:

Pull the two 1.5 mm

2

 (16 AWG) wires through grounded metal conduit from the MPLD2 to the 

installed single-gang back box.

7:

Strip 9-10 mm (3/8 in) from the ends of the 1.5 mm

2

 (16 AWG) installed control wires.

8:

Locate the WAGO cage clamp connectors in the packaging. WAGO connectors are provided as a 
means to connect the installed control wire to the harness wires provided on the EBDK-SWITCH.

9:

Open two terminal levers on each WAGO connector and insert the 1.5 mm

2

 (16 AWG) installed 

control wire for OUT and the RTN switch wire into terminals and close the levers. See the image 
below for topology.

10:

Install the switch into the back box and secure using the two screws provided.

11:

Restore the cover to the lower-left corner of the MPLD2 and secure with the four screws. 

Operation

Press the button on the EBDK Reset Switch to exit bypass/emergency mode and restore normal lighting.

DISENGAGE BREAKER TO TEST

FAULT

NORMAL

WHEN LIT

PUSH TO RESTORE

ALL FAULTS

MUST BE CLEARED

EBDK 

Reset Switch

MPLD2

Remove four

screws to

remove cover

Remove jumper 
and then 
terminate wires

Отзывы: