Automatic Load Control Relay

Automatic  Load  Control  Relay

 Page 6 of 8

Electronic Theatre Controls, Inc.

Installing a Remote Activation Input to the ALCR-DIN

The ALCR-DIN offers a normally closed, dry contact input to accommodate connection 
to fire alarm panels, security systems, and test switches. This input ships from the 
factory with a blue wire loop (jumper) off the bottom screw terminals. This complete loop 
disables remote activation.

The remote device that triggers the Emergency circuit “On” must provide a normally 
closed, maintained dry contact closure. When the remote device is activated, the 
contact closure is opened and the contacts force the ALCR into the emergency “On” 
state.

Step 1:

Power up and test your system before installing a remote activation input to your 
ALCR. See 

"Initial Test" on page 7

.

Step 2:

Remove the factory installed jumper from the Remote Loop In and Remote Loop 
Out terminals.

Step 3:

Connect the Remote Loop In and Remote Loop Out terminals on the ALCR-DIN 
to the single pole contacts on the remote device or test switch.

Step 4:

Continue to 

"Remote Activation Test"

 section on page 7.

Configuration of Time Delay

The Automatic Load Control Relay features a user configurable delay time between 
regaining normal power and removing power from the emergency lighting. This delay 
time could be used to account for loads that may require a warm up time, for example 
HID lamps. The unit ships from the factory configured for 0 delay time. If a longer 
transition time is required follow the steps below for configuration:

Step 1:

Press the 

[Option Button]

 located on the user 

interface of the ALCR. Both “Status” and 
“Remote” LEDs will blink to indicate the delay 
time that is configured.

Step 2:

Press the 

[Option Button]

 to increment 

through the available settings.

Step 3:

When the blink pattern matches your desired 
delay time, wait 10 seconds for the operation 
to time-out. The delay time setting will be 
saved to memory and the ALCR will return to normal operation.

N o t e :

ETC highly recommends that you power up and test your system before 

connecting to a remote device.

Do not remove the factory installed jumper unless you are installing a remote 

triggering device.

N o t e :

A remote device, such as a test switch or the external emergency system such 

as a fire alarm panel or security system must be installed within 1,000 feet of 

the ALCR-PP when using 18AWG wire.

N o t e :

The time delay only applies to the main contact on the ALCR. It does not apply 

to the auxiliary contact on the DIN rail unit.

Number of 

blinks

Delay time

1

no delay (default)

2

10 seconds

3

30 seconds

4

10 minutes

5

15 minutes

Содержание ALCR-DIN

Страница 1: ...rol Relay ALCR is a UL 924 listed device that is powered from an emergency source and provides power to emergency lighting load s The ALCR ensures a lights on state during loss of normal power while t...

Страница 2: ...DIN rail 35mm complies with DIN43880 and EN60715 Reference Installation and Termination of the ALCR DIN on page 4 Once installation of the Automatic Load Control Relay is complete reference Configurat...

Страница 3: ...s to the normal lighting circuit as shown b Connect the Normal Neutral White 18 AWG lead to the normal Neutral for the lighting loads Step 6 Proceed to Initial Test on page 7 Step 7 If you are install...

Страница 4: ...single pole contacts on the remote device or test switch Step 3 Continue to Remote Activation Test on page 7 Installation and Termination of the ALCR DIN The ALCR DIN is designed to attach to lighting...

Страница 5: ...ch Sense and Normal Neutral screw terminals as shown Step 4 If you are connecting to 0 10 Vdc Fluorescent lighting loads connect to the provided terminals labeled 0 10V FLO Reference Examples of Use o...

Страница 6: ...a user configurable delay time between regaining normal power and removing power from the emergency lighting This delay time could be used to account for loads that may require a warm up time for exam...

Страница 7: ...f reconnect the Normal Power Switch wire to the terminal Step 6 Turn On the normal circuit breaker The ALCR should now behave as described in the Examples of Use on page 8 Step 7 If you are installing...

Страница 8: ...gency Light Fixture ALCR Normal Neutral White Normal Hot Black Emergency Load Emergency Hot Emergency Neutral Gray Backup Arrangement When normal power is present the emergency load is turned off When...

Отзывы: