8
www.eta.co.at
Sample
Installation room
3.2
Sample
Decide where to place the ETAbox in the installa-
tion room
Fig. 3-1: Installation example
1
Access to the filling nozzles as well as permanent
ventilation and extraction
2
Filling hoses of the pellet supplier
3
Side inspection ports for the fill level
4
Pellet hoses from the ETAbox to the boiler
5
A minimum clearance must be kept between the
ETAbox and the boiler (dependent on the country-
specific regulations)
Before assembly, the ETAbox's final position in
the room must be determined. The following
points are to be observed in the process:
•
The extraction unit of the ETAbox is to be set up so
that the connectors for the pellet hoses are aligned
with the boiler and easily accessible.
•
Orient the ETAbox so that the filling nozzles are
accessible for later filling, If possible, the ETAbox
should abut an external wall, so that the filling
nozzles are accessible from outside. The filling
nozzles can be extended if required.
•
One of the two side inspection ports must be easily
accessible for monitoring the fill level in the fabric
sack of the ETAbox.
•
On the opposite side to the filling nozzles, a
minimum gap of 200 mm must be maintained from
the adjacent wall, so that the pellets are cushioned
and do not shatter against the wall.
•
A minimum clearance must be kept between the
ETAbox and the boiler depending on the country-
specific regulations.
Содержание ETAbox Speed
Страница 9: ...Installation room Sample 9 Required clearance for filling...
Страница 26: ...www eta co at...
Страница 27: ......
Страница 28: ...www eta co at www eta co at downloads DOWNLOAD...