![eta EEP 200 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/eta/eep-200/eep-200_service-manual_2430375042.webp)
42
www.eta.co.at
Maintenance (expert)
Records
3.15
Maintenance (expert)
Maintenance is necessary at least every 3 years, or when requested by the control system. We recommend
you perform maintenance annually.
Comments:
Tasks
Notes
Emptying ash bin
•
Emptying ash bin
•
Check the seals
Clean the piping
•
Clean the piping between boiler and precipitator
•
Clean the flue tube from the precipitator to the chimney
•
Vacuum the internal flue gas ducts
Clean flue gas recirculation (if installed)
Clean the precipitator
•
Check and remove ash accumulations
•
Clean the flushing air opening
•
Clean and inspect the electrode holder
•
Check the alignment of the electrodes
•
Check maintenance cover seal
Check idle position
•
Check idle position of the electrode dedusting
•
Check the idle position of both sliding rakes
Check de-ashing
•
Check the drive chains and position switches of the electrode dedusting
•
Check the drive chains and the position switches of both sliding rakes
Clean the draught fan
Clean the temperature sensor
Check the ash bin position switch
Check the safety switch for the maintenance cover
performed on: _________________________
performed by: _________________________
Содержание EEP 200
Страница 1: ...2017 10 04 EN 0000000366 V 002 X 35 4 X 39 1 93531 001 Precipitator EEP 200 Service manual ...
Страница 5: ...Cleaning and maintenance Maintenance notes 5 Do not use cleaning brushes to clean the components ...
Страница 27: ...Cleaning and maintenance Maintenance expert 27 ...
Страница 49: ......
Страница 50: ...www eta co at ...
Страница 51: ......
Страница 52: ...www eta co at www eta co at downloads DOWNLOAD ...