Page 6
FS-I01-151013
IF FITTING TO A PRE BUILT BASE:
Remove the front transit bolts and plates from the front of the oven.
Open the oven door and carefully remove the base bricks and insulation board.
Unscrew the rotating spigot.
Re-fit the insulation board, base bricks and close the oven door.
Position the oven on to your base and secure in position
This appliance is very heavy. 4 persons should be involved with
lifting.
WHEN FITTING TO THE SUPPLIED PEDESTAL:
Unpack your Esse steel pedestal base plate.
Position the base in you desired location on an appropriate surface to support the
weight.
The base has been designed to be free standing, however if base fixings are
required we would recommend M8 fixings appropriate to fixing the base to your
ground material.
Remove the supplied M8x30 Set screws from the base plate
Fit the pedestal leg and secure using the M8x30 Set screws
Lift the oven and position with the rotating spigot located in the pedestal leg.
Remove the front transit bolts and plates from the front of the oven.
This appliance is very heavy. 4 persons should be involved with
lifting.
Remove the Flue pipe and rain cowl from their packaging
Fix the rain cowl to the flue pipe using the self-tapping screws provided with
the rain cowl.
Fit the flue pipe to the oven and fix in place using the self-tapping screws
provided with the flue pipe.
A high temperature sealant should be applied where the flue pipe and the flue
collar meet. The sealant should be an appropriate high temperature sealant
that can withstand 1200°C. This is to prevent rain entering the unit when not
in use.