![ESPN X Games Snowboarder Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/espn/x-games-snowboarder/x-games-snowboarder_operators-manual_2427880008.webp)
Snowboarder™ Operator’s Manual
8
|
P a g e
Setup
Cabinet Assembly
Note: See foldout setup guide.
1.
Begin assembly by aligning Snowboard pedestal up to the cabinet and connecting all electrical
cables. Secure pedestal to cabinet with (2x) mounting brackets.
2.
Identify the left and right side panel assemblies and place in position by aligning their bottoms with
cutouts in pedestal. Secure the outside of each side panel to cabinet and pedestal.
3.
Secure the inside of each side panel to the cabinet and control panel.
4.
Slide marquee metal struts into holes in top of cabinet and connect all electrical cables. Secure
marquee to cabinet.
Check Electrical Settings
1.
Verify the voltage of the AC outlet you will be plugging the game into.
2.
Verify the AC outlet’s ground connection is present and working.
Startup Game
1.
Plug the line cord into an AC outlet.
2.
Turn the main cabinet power switch on.
3.
Verify the game and all components are operating normally. See
Basic Functional Test on Initial
Power Up
in the
Diagnostics and Adjustments
section for the recommended procedure.
4.
Authorize a set of cards. See
Authorizing More Cards
under the
Cards and Card Dispensers
section.
Содержание X Games Snowboarder
Страница 2: ......
Страница 9: ...Snowboarder Operator s Manual 9 P a g e...
Страница 10: ...Snowboarder Operator s Manual 10 P a g e...
Страница 28: ......
Страница 29: ...Snowboarder Operator s Manual 29 P a g e Electrical and Mechanical Illustrations...
Страница 48: ......