Model 75K2 service manual, SM75K2_0413 Page 6
eskridge, inc. olathe, KS. 913-782-1238 www.eskridgeinc.com
Kickdown Subassembly
(items 13e, 13f, 16D, 16e, 16f, 16g, 17, 18)
If you experience problems with your kickdown system, please refer
to the Kickdown Assembly or Kickdown Adjustment instructions. If
neither of these solves your problem, contact Eskridge for service
all subassembly service or repairs should be complete at this
time. continue to unit assembly to complete unit buildup.
unit assembly
1)
When all subassemblies are complete, the unit is ready to be
assembled.
2)
Install the Stage II carrier assembly
(7)
onto the output shaft;
align the splines of the carrier
(7a)
with the splines of the
shaft
(8)
and slide the carrier onto the shaft.
3)
Lubricate o-ring
(11b)
and install on the pilot of the
Stage II ring gear
(3)
.
caution: Hold ring gear by outside or use lifting device to pre-
vent injury.
5)
Install Stage II sun gear
(9)
into Stage II carrier assembly
(7)
.
Place thrust washer
(10a)
onto Stage II carrier
(7a)
.
6)
Align gear teeth of ring gear
(3)
with the gear teeth of the
planet gears
(7b)
and place on base. Align mounting holes
of ring gear with holes in base using the scribed line made
during disassembly for reference.
7)
Lubricate o-ring
(11b)
and install on the pilot of the
Stage I ring gear
(2)
. Install ring gear and align mounting holes
of ring gear with holes in base. Use the scribed line made
during disassembly for reference.
8)
Slide Stage I carrier
(6a)
onto Stage II sun gear
(9)
.
9)
Install input gear
(5)
and thrust washers
(10a & 10b)
. Lubri-
cate o-ring
(11b)
and install on the pilot of the gearbox cover
(4)
. Noting the scribed line made during disassembly, install
cover
.
10) Ensure the unit spins freely by using a splined shaft to drive
the input gear
(5)
.
11) Install motor
(17)
onto cover
(4)
using hex-head capscrews
(13b)
and lockwashers
(13D).
Lube fasteners and torque to
110 ft-lb.
12) If the kickdown system was removed, reassemble as detailed
in Kickdown Assembly Instructions.
18
16E
16D
16G
16F
13E
13F
17
13) Place bail
(15)
onto assembly and align holes in bail and cov-
er
(4)
using scribed line made during disassembly as a refer-
ence. Install and torque the 20 1/2-13 hex head capscrews
(13a)
with flatwashers
(13c)
.
Torque the capscrews to 110
ft-lbs dry, or 80 ft-lbs if fasteners are lubricated.
14) Fill the unit to the proper level, as specified, with GL5 EP
80/90 gear oil.
The digger is now ready to use.