esera automation 11319 Скачать руководство пользователя страница 8

All rights reserved. Reproduction as well as electronic duplication of this user guide, complete or in part, requires the written consent of 
ESERA GmbH. Errors and technical modification subject to change. 



ESERA GmbH, ESERA-Automation 2020 

www.esera.de 

11319 V3.0 R1.0  Manual  

Page 8 of 9 

 
 
 
 

19 

Your software not included? 

The 1-Wire Controller 1 can be integrated extremely universally into many devices and software solutions due to 
the text protocol used.  
 

 

20 

Operating conditions 

The operation of the assembly group can take place only on condition of observing the required voltage and the 
ambient  conditions.  The  operating  position  of  the  device  is  irrelevant.  The  device  is  meant to  be  used  in  dry  or 
humid areas. 
Should condensed water build up within the sensor, an acclimatisation period of at least 2 hours must pass. 
Assembly groups and components do not belong into the hands of children! 
The building group can be operated only under the supervision of an electrically skilled person. 
In industrial facilities, the accident prevention regulations of the federation of industrial professional associations for 
electrical installations and equipments must be observed. 
Do  not  operate  the  assembly  group  in  an  environment  with  inflammable  gases,  vapours  or  dusts  or  in  an 
environment where such gases, vapours or dusts may be found. 
 

21 

Assembly 

The installation location must be protected against moisture. The device may only be used in dry indoor rooms. 
The device is intended for mounting inside a control cabinet as a stationary device.  
 

22 

Disposal Note 

Do not dispose of this device in the household waste. Electronic devices must be disposed of in 
accordance with directives for disposing of waste electrical and electronic equipment at local 
collection points for electronic waste material. 
 

23 

Safety Instructions 

When using products that come into contact with electrical voltage, the valid VDE regulations must be observed, 
especially VDE 0100, VDE 0550/0551, VDE 0700, VDE 0711 and VDE 0860 

 

All final or wiring work must be carried out with the power turned off. 

 

Before opening the device, always unplug or make sure that the unit is disconnected from the mains. 

 

Components, modules or devices may only be put into service if they are mounted in a contact proof housing. During 
installation they must not have power applied. 

 

Tools may only be used on devices, components or assemblies when it is certain that the devices are disconnected 
from the power supply and electrical charges stored in the components inside the device have been discharged. 

 

Live cables or wires to which the device or an assembly is connected, must always be tested for insulation faults or 
breaks. 

 

If an error is detected in the supply line, the device must be immediately taken out of operation until the faulty cable 
has been replaced. 

 

When using components or modules it is absolutely necessary to comply with the requirements set out in the 
accompanying description specifications for electrical quantities. 

 

If the available description is not clear to the non-commercial end-user what the applicable electrical characteristics for 
a part or assembly are, how to connect an external circuit, which external components or additional devices can be 
connected or which values these external components may have, a qualified electrician must be consulted. 

 

It must be examined generally before the commissioning of a device, whether this device or module is basically 
suitable for the application in which it is to be used. 

 

In case of doubt, consultation with experts or the manufacturer of the components used is absolutely necessary. 

 

For operational and connection errors outside of our control, we assume no liability of any kind for any resulting 
damage. 

 

Kits should be returned without their housing when not functional with an exact error description and the 
accompanying instructions. Without an error description it is not possible to repair. For time-consuming assembly or 
disassembly of cases charges will be invoiced. 

 

During installation and handling of components which later have mains potential on their parts, the relevant VDE 
regulations must be observed. 

 

Devices that are to be operated at a voltage greater than 35 VDC / 12mA, may only be connected by a qualified 
electrician and put into operation. 

 

Commissioning may only be realized if the circuit is built into a contact proof housing. 

 

If measurements with an open housing are unavoidable, for safety reasons an isolating transformer must be installed 
upstream or a suitable power supply can be used.  

 

After installing the required tests according to DGUV / regulation 3 (German statutory accident insurance, 

https://en.wikipedia.org/wiki/German_Statutory_Accident_Insurance

) must be carried out. 

 

 

Содержание 11319

Страница 1: ...ns carefully to the end especially the section referring to the safety notes 2 Product description Independent management The 1 Wire Controller is designed for the independent management of a 1 Wire network You no longer have to worry about the 1 Wire commands or formulas in order to evaluate sensor data The controller independently scans the 1 Wire network for components sensors and actuators and...

Страница 2: ...ndustrial applications and enables significant added value beyond the sensor and chip data The Auto E Connect function automatically recognizes ESERA chips sensors and actuators starts suitable libraries and outputs fully formatted data The Auto E Connect functionality will be available from mid 2020 via 1 Wire Controllers 1 Wire Gateways and 1 Wire ECO from ESERA available Further information on ...

Страница 3: ...ing the function of the displays Display Designation Function LED Green PWR Display for supply voltage LED Green DATA after switching on the device the LED flashes 3 times flashes during 1 Wire activity View when sending data via the data interface flashes very quickly if AL Receive has been activated and the CAL messages of the control system are missing LED Green Data interface Network Link LED ...

Страница 4: ...cation of this user guide complete or in part requires the written consent of ESERA GmbH Errors and technical modification subject to change ESERA GmbH ESERA Automation 2020 www esera de 11319 V3 0 R1 0 Manual Page 4 of 9 9 Connection example 1 Wire Multisensor ...

Страница 5: ...ion of this user guide complete or in part requires the written consent of ESERA GmbH Errors and technical modification subject to change ESERA GmbH ESERA Automation 2020 www esera de 11319 V3 0 R1 0 Manual Page 5 of 9 10 Connection example 1 Wire Hub III Sensors and Actuators ...

Страница 6: ...nd in the download area of the ESERA online shop 13 Configuration and Communication with 1 Wire Controller 1 The 1 Wire Controller 1 has extensive configuration and formatting options that can be read and operated with the ESERA Config Tool 3 Since the communication between the 1 Wire controller 1 and the Config Tool 3 takes place via the open ESERA ASCII text protocol you can also use any termina...

Страница 7: ...Example for the integration into IP Symcon On our website we provide ESERA IP Symcon software modules for easy integration of the 1 Wire Controller into IP Symcon This provides you with seamless integration into the software Details can be found on the ESERA website under Compatible controllers central units IP Symcon integration https www esera de kompatible steuerungen zentralen ip symcon integr...

Страница 8: ...of housing During installation they must not have power applied Tools may only be used on devices components or assemblies when it is certain that the devices are disconnected from the power supply and electrical charges stored in the components inside the device have been discharged Live cables or wires to which the device or an assembly is connected must always be tested for insulation faults or...

Страница 9: ...ESERA GmbH accepts liability neither for the constant and uninterrupted availability of the ESERA GmbH for technical or electronic errors in the online offer We develop our products further and we reserve the right to make changes and improvements to any of the products described in this documentation without prior notice If you need documentation or information about older product versions contac...

Отзывы: