11
6
Figure
Threaded Studs on P4 Rail that
you assembled in
Step 7
will go
in these holes in the next step.
10.
Attach Hanger assemblies to the threaded studs on Mounting Frame
P5
with
Hex Nuts
H2
as
shown in Figure 6
.
PARTS NEEDED:
1 - (P5) Mounting Frame
4 - Hanger assemblies
8 - (H2) Hex Nuts
Hanger
Assembly
H2
H2
Hanger
Assembly
H2
Hanger
Assembly
Hanger
Assembly
H2
P5