Figure 1

INSTALLATION  TIMELINE

PART 1

Day 1.

Post assembly, pour concrete, set post and

Day 2.

Allow concrete to cure.

PART 2

Day 3.

Complete   assembly  instructions.  (Requires
3-4 adults)

Note: For best results with less vibration, your system
should  be  independent  of  court.  If  pouring  concrete  for
both at same time, add an expansion joint in between.

2.

1.

Determine  the  location  of  the  hole.
The proper location is as close to the
court  without  making  contact,  as
shown  in

Figure  1

.  This,

however, is a general rule.
If  you  need  to  locate  the
hole  in  a  location  other  than  this,  use
the  following  dimensions  as  a  guide.

Overhang when adjusted to 10 ft. = 19 1/4”

2.  Vertical main post assembly is a two part process.

1.  Prior to pole installation and goal assembly, call utility services for location of underground utility lines before you dig.

POST INSTALLATION INSTRUCTIONS (Day 1)

32"

16"

Diameter

Court

Hole

Court Level

20” Diameter

Court

Top View

Hole must be close to 

the Court without 

making contact.

Dig a round hole 32” deep and 16” in diameter at 

the top and 20” in diameter at the bottom of the hole. 

If you live in an area where frost heaves may pose a 

problem, consult your local building inspector to 

determine the proper hole depth. See 

Figure 1

.

Before  digging  hole  for  your  system,  check  for
buried power, gas, water, and telecommunication
lines! Failure to do so could result in serious or fatal
injury!  Contact your local utility company if unsure.

16"

3.

Place and center a masonry block in the bottom of the 

hole so there is exactly 16” from the playing surface to 

the top of the masonry block. See 

Figure 2

.

Figure 2

Hole

Masonry

Block

Allow concrete to cure.

18 INCH

MINIMUM

REAR

CLEARANCE

REQUIRED

Note: When digging hole, if you hit rock 
and cannot dig through contact a contractor.

Note: Minimum of 18” rear clearance is required behind pole.

ITEMS NEEDED (not included)

9-
1-
1-
1-
1-
1-
6-
2-
1-
1-
1-
1-
1-
1-
1-

50 lbs bags of concrete
Post hole digger (optional)
Wheel barrow
Garden hose
Level
Tape Measure
2X4’s
50 lbs sand bags
Standard masonry block
9/16”, 3/4” & adjustable wrench
Cordless drill & 9/64” drill bit
5/16” socket driver (for cordless drill)
Pair of Safety Glasses
Phillips Screwdriver
Ladder

Содержание B5400F

Страница 1: ...to tighten them O W N E R S M A N U A L B5400W Please Do Not Return This Product T o The Store Contact Escalade Sports customer service department at Phone 1 888 USA GOAL Toll Free Fax 1 866 873 3536...

Страница 2: ...any part of the unit including the backboard rim support braces or net Do not slide climb or play on pole Keep organic material away from pole base Grass litter etc could cause corrosion and or deter...

Страница 3: ...10 X 1 3 3 8 16 3 8 16 X 1 3 4 4 Pieces Hex Bolt 2 Pieces 13 6 Pieces...

Страница 4: ...ig a round hole 32 deep and 16 in diameter at the top and 20 in diameter at the bottom of the hole If you live in an area where frost heaves may pose a problem consult your local building inspector to...

Страница 5: ...YING SURFACE BEFORE POURING CONCRETE ON STEPS 6 8 Before putting any of the poles tubes together mark bottom pole 2 6 inches from the top end Be sure to match up both Back Side stickers on the back of...

Страница 6: ...0 Let concrete Stand for a MINIMUM of 48 hours 2 days Note Periodically check pole with level to ensure that pole is vertical Figure 5 IMPORTANT Let concrete stand for a MINIMUM of 48 hours 2 days bef...

Страница 7: ...g one hex bolt 7 and one lock nut 4 Slide tab on Actuator 16 between Post Ears 30 and Secure using one bolt 19 two washers 20 and one lock nut 21 See Figure 7 Tighten bolts tight Cap may be pre instal...

Страница 8: ...18 two plastic washers 5 and lock nut 4 Note make sure lettering is right side up Do NOT tighten bolt 22 at this time Figure 8 22 18 5 18 4 3 11 18 Insert Two Tube Plugs 9 into open ends of Lower Arms...

Страница 9: ...ug in Note Tube plugs may be pre installed by the factory 21 Slide Actuator Crank 35 onto shaft on the bottom of Actuator 16 Line up hole in shaft with hole in Actuator Crank and insert Pin 34 to secu...

Страница 10: ...d two lock nuts 4 See Figure 12 NOTE Do NOT over tighten these bolts This is a pivot point Snug is tight enough 24 Attach Upper Board Arms to upper mounting tubes on backboard using two bolts 24 two p...

Страница 11: ...ything is tightened properly DO NOT over tighten pivot points snug is tight enough 29 Use the Backboard Pads 37 and 38 as a template and mark the hole locations on the backboard frame See Figure 13 an...

Страница 12: ...Top Post Pad strap should be above Post Ears See Figure 15 Figure 15 12 32 Adjust unit to 7 1 2 feet Use a tape measure to measure from the top of the rim to the playing surface Stick Height Decal 17...

Страница 13: ...s neither assumes nor authorizes any other person to assume for it any other liability in connection with the goods sold This warranty shall not apply in any manner to parts or accessories not manufac...

Страница 14: ...1 This Manual 1 3M 6899 01 48 Board Pad Right 1 3M 6900 01 48 Board Pad Left 1 3M 8901 01 3F 6010 00 Net 1 3 8 16 x 1 3 4 Carriage Bolt 4 Not Used 1B 6821 00 Self Tapping Screw 10 x 1 6 2L 7196 01 B54...

Страница 15: ...13 5 14 5 15 16 21 20 4 4 18 35 1 7 9 18 18 8 25 19 18 20 6 11 5 29 38 37 28 23 3 41 2 18 5 4 22 4 10 7 10 4 24 18 18 18 26 4 Pre Installed 42 40 27 32 33 42 17 39 2L 7196 01 15 34 30 Pre Installed...

Отзывы: