5
6
3
OUICK FIT!
Press
Press
»
Cl
Click!
25°C
22°C
33°C
40°C
47°C
54°C
60°C
https://esbe.eu/group/products/
thermostatic-mixing-valves
1
SERIES ARA600 Pr
op
Pro
P
SERIES ARA600 3-Point
SERIES ARA60
SERIES ARA600 2-Point
https://esbe.eu/group/
products/rotary-actuators
Commissioning actuator
Commissioning
fixed temperature
Series GFA211, GFA212
CCW
N
CW
bk
bu
bn
L
(bn)
N
(bu)
PE
(gn)
Electric installation
www.esbe.eu
SERIES VTA370/VTA570
Fit supply pipes
40-50Nm
c/c 125mm
Adjust wallbracket
Assembling on wall
4
Assemble insulation
30mm
Assemble actuator/controller
Series GRA2xx, GBA211, GRC2xx
0
20 MINUTES
Commissioning
Flow
Filling and
venting
Open
White mark, indicate
check valve position
45
o
Filling and venting
Preparation
Open
Closed
90
o
Checkvalve position
Flow
OPEN
AIR
CLOSE
Assemble removed knob