Chapter 5: Pre-Election Day Tasks
52
EVS5200_DOC_SOP_DS850
3.
Insert the bottom battery connector
into the top battery connector. The
picture below on the left shows the
two connectors before they are
connected; the picture below on the
right shows the two connectors after
they have been connected.
4.
Replace the front panel.
5.
Move the UPS to the spot where you
want it to be when the scanner is
operating.
6.
Plug the UPS into a power outlet.
Connecting the Scanner to the UPS
Plug one end of the DS850’s power cord into the left side of the DS850, just below the
power switch. Plug the other end of the power cord into one of the bottom receptacles
on the UPS that provides battery backup. Connect the data communication cable to the
UPS and one of the USB ports on the DS850. The data communication cable is used by
the UPS to let the DS850 know when the UPS is operating on battery power.
Содержание DS850
Страница 1: ...DS850 Operator s Guide Document Version 4 0 Software Version 2 10 Published February 26 2014 ...
Страница 48: ...Chapter 3 DS850 User Interface 42 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 ...
Страница 191: ...Chapter 11 Menu Structure 185 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 Election menu ...
Страница 192: ...Chapter 11 Menu Structure 186 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 Reports menu ...
Страница 193: ...Chapter 11 Menu Structure 187 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 System menu ...
Страница 194: ...Chapter 11 Menu Structure 188 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 Hardware menu ...
Страница 199: ...Index 193 EVS5200_DOC_SOP_DS850 Software Version 2 10 Published February 26 2014 ...