
207
figure 5-2. screw fastening order
Two-Point Mounting Type
Temporary tightening
Final tightening
Four-Point Mounting Type
Temporary tightening
Final tightening
5.4 IGBt handling & replacement
Since IGBT gates are insulated from any other conducting region, care should be taken to prevent static build up, which
could possibly damage gate oxides. All IGBT modules are shipped from the factory with conductive foam contacting the
gate and emitter sense pins.
Always ground parts touching gate pins during installation. In general, standard ESD predictions application to FETs should
be followed.
Other handling precautions that should also be observed are as follows:
•
Use grounded work station with grounded floors and grounded wrist straps when handling devices.
•
Use a 100W resistor in series with the gate when performing curve tracer tests.
•
Never install devices into systems with power connected to the system.
•
Use soldering irons with grounded tips when soldering to gate terminals.
When mounting IGBT modules on a heatsink, certain precautions should be taken to prevent any damage against a sudden
torque. If a sudden torque (“one-sided tightening”) is applied at only one mounting terminal the ceramic insulation plate or
silicon chip inside the module may get damaged.
The mounting screws are to be fastened in the order shown in Figure 5-2. Also, care must be taken to achieve maximum
contact (i.e. minimum contact thermal resistance) for the best heat dissipation.
Application of a thermal pad on the contact surface improves it thermal conductivity. See Replacement Parts section for
the required pad.
A torque wrench should be used. Tighten mounting screws to 28 in-lbs; wire connecting screws to 19 in-lbs. If torque is too
heavy, the device can damage like the above “one-sided tightening”.
sectIon 5
maIntenance
Содержание Powercut 875
Страница 4: ...4 table of contents ...
Страница 8: ...8 OBSAH ...
Страница 18: ...18 ODDÍL 3 INSTALACE ...
Страница 24: ...24 ODDÍL 4 OBSLUHA ...
Страница 28: ...28 INDHOLDSFORTEGNELSE ...
Страница 38: ...38 SEKTION 3 BETJENING ...
Страница 44: ...44 SEKTION 4 BETJENING ...
Страница 48: ...48 INHOUDSOPGAVE ...
Страница 58: ...58 HOOFDSTUK 3 INSTALLATIE ...
Страница 64: ...64 HOOFDSTUK 4 BEDIENING ...
Страница 68: ...68 table of contents ...
Страница 78: ...78 SECTION 3 INSTALLATION ...
Страница 84: ...84 SECTION 4 OPERATION ...
Страница 88: ...88 SISUKORD ...
Страница 98: ...98 OSA 3 PAIGALDAMINE ...
Страница 104: ...104 OSA 4 KASUTAMINE ...
Страница 108: ...108 SISÄLLYSLUETTELO ...
Страница 118: ...118 KAPPALE 3 ASENNUS ...
Страница 124: ...124 KAPPALE 4 KÄYTTÖ ...
Страница 128: ...128 table DES MATIÈRES ...
Страница 138: ...138 SECTION 3 INSTALLATION ...
Страница 144: ...144 SECTION 4 FONCTIONNEMENT ...
Страница 148: ...148 INHALTSANGABE ...
Страница 158: ...158 ABSCHNITT 3 INSTALLIERUNG ...
Страница 164: ...164 ABSCHNITT 4 BEDIENUNG ...
Страница 168: ...168 TARTALOMJEGYZÉK ...
Страница 178: ...178 3 SZAKASZ ÖSSZESZERELÉS ...
Страница 184: ...184 4 SZAKASZ MŰKÖDÉS ...
Страница 188: ...188 INDICE ...
Страница 198: ...198 SEZIONE 3 INSTALLAZIONE ...
Страница 204: ...204 SEZIONE 4 FUNZIONAMENTO ...
Страница 216: ...216 section 6 replacement parts ...
Страница 217: ...217 section 6 replacement parts ...
Страница 218: ...218 section 6 replacement parts ...
Страница 219: ...219 section 6 replacement parts ...
Страница 220: ...220 section 6 replacement parts ...
Страница 221: ...221 section 6 replacement parts ...
Страница 222: ...222 section 6 replacement parts ...
Страница 223: ...223 section 6 replacement parts ...
Страница 224: ...224 section 6 replacement parts ...
Страница 225: ...225 section 6 replacement parts ...
Страница 226: ...226 section 6 replacement parts ...