![ESAB PCM-1125 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/esab/pcm-1125/pcm-1125_instruction-manual_2425129023.webp)
3.6 SeCONDARY (OuTPuT) CONNeCTIONS (ReFeR TO FIg. 3-1)
1. For operator safety, the torch connections are located on the output terminal board behind the lower portion of the
front panel. Remove access door to output terminal board from right panel of power source.
. Thread the power cable, pilot arc cable and switch lead of the PT-7 through the right open bushing of the front panel.
Connect power cable to the torch fitting (left-hand threads); bolt the pilot arc cable ring connection to the copper ter-
minal; and plug in the switch lead to the torch switch receptable on the output terminal board. Make sure the power
and pilot arc cable connections are wrench-tight. Make sure plug of switch lead is firmly locked in place.
. Reassemble the access door to the power source.
4. Connect your air supply to the inlet connection of the filter-regulator.
5. Clamp the work cable to the workpiece. Be sure the workpiece is connected to an approved earth ground with a properly
sized ground cable.
SeCTION 3
INSTAllATION
WARNINg
Before making any connections to the power source output terminals, make sure
that all primary input power to the power source is deenergized (off) at the main
disconnect switch and that the input power cable is unplugged.
Содержание PCM-1125
Страница 4: ... table of contents ...
Страница 20: ...20 section 2 description ...
Страница 26: ...26 section 3 installation ...
Страница 30: ...30 section 4 operation ...
Страница 44: ...44 section 5 maintenance ...
Страница 56: ...56 notes ...
Страница 57: ...57 notes ...
Страница 58: ...58 notes ...
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......